Safety and Security Committee. Zoetermeer, November 18 th , 2011. Jo Urlings. Safety and Security Committee. Content. Progress CEN WG 39 Information ERA and SMS Safety on Track, Betuweline.

marin
Download Presentation

Safety and Security Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety and Security Committee Zoetermeer, November 18th, 2011 Jo Urlings

  2. Safety and Security Committee Content • Progress CEN WG 39 • Information ERA and SMS • Safety on Track, Betuweline

  3. Progress CEN/TC 256 WG 39Starts May 16th 2005First drafts end 2011 Safety and Security Committee “Safety on track during work”

  4. “Safety on track during work” Safety and Security Committee • Railway risks and common principles for protection of fixed and mobile work sites • Common solutions and technology • Competence of personnel related to work on or near the railway track

  5. Part 2.1:Common solutions and technology -System Requirement Specification for Track Warning Systems(TWS) Safety and Security Committee New Part 2 New Part 4 Part 2.2:Common solutions and technology-Technical requirements for separation (Fences)

  6. Progress CEN/TC 256 WG 39Starts May 16th 2005First drafts end 2012 Safety and Security Committee “Safety on track during work” New Convenor: Mr Jeroen van den Tweel, NL

  7. Safety and Security Committee Information ERA and SMS • ERA recently published • Report 2011 from ERA • Guidance on SMS • EBA (D) has created process- oriented SMS with approval for 5 year

  8. Safety and Security Committee Safety on Track, Betuweline