280 likes | 292 Views
Government Buildings Agency mandates BIM. 14 juni 2012. Subjects:. Building Information Modelling: present situation Importance of BIM for the Government Buildings Agency Connection with functional specification First results: 3 models for Maincontracting Challenges for the supply chain
E N D
Government Buildings Agency mandates BIM 14 juni 2012
Subjects: • Building Information Modelling: present situation • Importance of BIM for the Government Buildings Agency • Connection with functional specification • First results: 3 models for Maincontracting • Challenges for the supply chain • Questions?
Our view of working with BIM: • Central 3D model or combination of models • All data needed in the proces of design, construction and maintenance integrated in the model • Used by all parties in the proces
BIM applications and file formats • Wide variety of BIM applications for modelling and analysis of different aspects • No strong international standards yet • Exchange between BIM applications not always reliable
Penetration in the Dutch building sector? • In the past few years the use of BIM applications by construction companies, design offices and other parties has seriously increased • However, no mainstream yet: mostly ‘in company’ use, incidental exchange between parties
Motivation for Rgd BIM standard: • BIM fits Rgd’s decision to fully concentrate on its role as public real estate procurer: • Rgd needs building information to be in control on individual buildings as well as the entire building stock (7,000,000 m2) • Diminishing inefficiency – especially in maintenance and operation
Embedding in various types of contracts: • Best chances in long-term contracts for maintenance (M): • DBFMO: 8 contracts to be tendered from 2011 on • Maincontracting maintenance: 3 pilot contracts in 2012 • DBM: under development
Which requirements in BIM standard? • All physical an spatial elements represented in the model – in principle in 3D • Functional specifications attached to this representation • All required building documentation and information extracted from the model
Applications and file formats • Contractor may choose any BIM application or file format • Extracted files in DWG (conventional plans, sections) and IFC (3D model) • Native format BIM files must also be provided for development purposes
Functions and requirements • DBFMO, DBM, Maincontracting: contracts based on functional specification • Expressed in terms of functions and requirements • Functions and requirements stored in database (Relatics)
BIM as a regular information service: • Alterions to building reflected in the model • Extracted documents up-to-date and available at all times • Extracted documents subject to monitoring and payment mechanism
Rgd BIM standard is version 1.0 ! • First priority: getting BIM exchange to actually work • Experience leads to improved versions of standard • Further development of standard communicated with organisations representing the construction sector • Rgd monitors the actual use BIM in the supply chain + ICT developments
Three models for maincontracting: • Revit models commisioned by Rgd • Based on as-built drawings + on site verification and additional measurement • Limited to construction and spatial elements + functional specifications (no MEP) • Handover to maincontractor planned July 2012
BIM applications and file formats • Problem: future development of applications uncertain – in particular with respect to exchange between apllications • Challenge: practical choices among present applications and formats for maximum result – keep a close eye on further developments in BIM software
Information exchange between parties • Problem: present culture of information exchange still largely based on one-time hand over of paper documents • Challenge: start experimenting with information requirements in long term contracts, aiming at permanent management and exchange of digital information
Existing buildings in use • Problem: existing information (esp. drawings) often incomplete / inconsistent / unreliable; disturbance of user proces not allowed • Challenge: efficient interpretation of existing drawings and other documents • Challenge: efficient application of techniques for measuring and verification on site