An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research

  2. Asphalt Specification Changes July 2005 • What are we going to talk about? • Background & General Information • Specifics on 334 Changes…a bunch! • Specifics on 337 Changes…a few! • Specifics on 234 Changes…one slide! • Questions & Discussion

  3. Asphalt Specification Changes July 2005 • CQC Asphalt Specification Task Team • Industry, FHWA, FDOT • Fall 2004 • Statistical evaluation of data • Review significant changes to… • 334 Superpave Asphalt Concrete • 337 Asphalt Concrete Friction Courses • 234 Superpave Asphalt Base

  4. Asphalt Specification Changes Section 334 • General reorganization: • 334-1 Description • 334-2 Materials • 334-3 General Composition of Mixture • 334-4 Contractor Process Control • 334-5 Acceptance of the Mixture • 334-6 Comparison Testing • 334-7 Method of Measurement • 334-8 Basis of Payment

  5. Asphalt Specification Changes Section 334 • 334-5 Acceptance of the Mixture • 334-5.1 General • 334-5.2 Lot Sizes • 334-5.3 Initial Production Requirements • 334-5.4 Quality Control Sampling and Testing • 334-5.5 Verification Testing • 334-5.6 Resolution System • 334-5.7 Independent Sample Verification Testing • 334-5.8 Surface Tolerance • 334-5.9 Minimum Acceptable Quality Levels

  6. Asphalt Specification Changes Section 334 • 334-1.4 Thickness • Specify thickness instead of spread rate • Old: 200 lbs/yd2 • New: 2 inches • Control based on spread rate • Convert thickness to spread rate: • Spread rate (lbs/yd2) = t x Gmm x 43.3 • Plan quantities based on Gmm of 2.540 • Approximately 110 lbs/yd2 – granite mix

  7. Asphalt Specification Changes Section 334 • 334-1.4.Thickness • Fine Mixes (Nearest ½ inch) • Type SP-9.5 1 – 1½ inches • Type SP-12.5 1½ - 2½ inches • Type SP-19.0 2 - 3 inches • Permits two layers of SP-9.5 (fine) • Stacking • Can’t use SP-9.5 (fine) on Traffic Level D & E

  8. Asphalt Specification Changes Section 334 • 334-1.4.Thickness • Coarse Mixes (Nearest ½ inch) • Type SP-9.5 1½ - 2 inches • Type SP-12.5 2 - 3 inches • Type SP-19.0 3 - 3 ½ inches

  9. Asphalt Specification Changes Section 334 • 334-2.2 Superpave Asphalt Binder: • PG 67-22 – Standard Binder Grade • Traffic Level D – PG 76-22 top structural layer • PG 76-22 is polymer modified • Traffic Level E – PG 76-22 top two structural layers • 334-3.2 Mix Design: • 3 mix designs/NMAS/traffic level/binder grade/contract year • Coarse and fine allowed for all Traffic Levels

  10. Asphalt Specification Changes Section 334 • 334-4 Process Control • Address in QC Plan how PC failures will be handled • Basically need to address problem, then resample • Second failure stop production, contact Engineer • 334-5.1.2 Acceptance Testing Exceptions: • Less than 500 tons of any mix type, visual inspection • Engineer may require PC tests or IV tests

  11. Asphalt Specification Changes Section 334 • 334-5.2 Lot Sizes • If a Lot is terminated on QC failure, Lot sizes go to 2000 tons • Partial Lots will not be redefined • 334-5.4.4 Individual Test Tolerances for Quality Control Testing: • Revised Master Production Range

  12. Asphalt Specification Changes Section 334

  13. Asphalt Specification Changes Section 334 • 334-5.4.4 Individual Test Tolerances for Quality Control Testing: • Added single density value < 91.00% • Coarse mixes • Single low density value – correct problem • Two in same sublot - stop • Any Lot terminated on QC failure is limited to a maximum pay factor of 1.00 per characteristic • 334-5.5 Verification Testing: • Single non-comparison → Resolution

  14. Asphalt Specification Changes Section 334 • 334-5.6.3 Resolution Determination: • No additional time granted • 334-5.9.5 Defective Material: • “Cleaned up” • Better describes actual process • Allows delineation testing

  15. Asphalt Specification Changes Section 334 • 334-8.2 Pay Factors: • Modified Small Quantity Pay Table • Modified PWL Spec Limits

  16. Asphalt Specification ChangesSection 337Asphalt Concrete Friction Courses • 337-2.2 Asphalt Binder: • Use PG 76-22 when called for in Contract, otherwise ARB • 337-6.2.1 Individual Test Tolerances for FC-5 Production: • Single binder content out = stop • Two out on gradation = stop • Address IAW “Defective Material” Note: 334-9.4 no longer exists, 334-5.9.5 was intended.

  17. Asphalt Specification Changes Section 337 • 337-8 Thickness of Friction Courses • FC-9.5 & FC-12.5: use 334-1.4 • Spread rate (lbs/yd2) = t x Gmm x 43.3 • FC-5: • Spread rate (lbs/yd2) = t x Gsb x 40.5 • Gsb= combined aggregate bulk specific gravity of the verified mix design • Plan quantities based on Gsb of 2.635 • Spread rate of 80 lbs/yd2 • 337-9.3 Hydrated Lime Pretreatment: • Allow lime pretreated aggregate • 45-day window for use after pretreatment • Spec addresses QC and certification requirements for blending operations

  18. Asphalt Specification ChangesSection 234 Superpave Asphalt Base • 234-8 Thickness Requirements. • Convert thickness to spread rate: • Spread rate (lbs/yd2) = t x Gmm x 43.3

  19. Questions?