1 / 24

Note to presenters -

Minimum Requirements Analysis. Note to presenters - This file is part of the FS Resources section at: http://www.wilderness.net/fs/ This presentation should be reviewed and revised as needed to match the training objectives and target audience and to insert local images where needed.

maxim
Download Presentation

Note to presenters -

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minimum Requirements Analysis • Note to presenters - • This file is part of the FS Resources section at: http://www.wilderness.net/fs/ • This presentation should be reviewed and revised as needed to match the training objectives and target audience and to insert local images where needed. • The Minimum Requirements Analysis training presentations are posted in 6 parts which may be combined and used as needed: • Introduction • Basis in Law and Policy • Definitions • Minimum Requirements process • Step 1 • Step 2 • Use of the MRA process • Use of Traditional Skills and Tools

  2. Minimum Requirements Analysis 2-Step Process Step 1: Is it necessary to take action in wilderness? Step 2: What is the minimum tool or activity?

  3. Minimum Requirements Analysis The Wilderness Act - Section 4 (c): Prohibited Uses “Except … as necessary to meet minimum requirements for the administration of the area for the purpose of this Act…” Minimum Requirement == Minimum Tool

  4. Minimum Requirements Analysis What is a Minimum Requirements Decision? Basic Definition Minimum: the least possible action, method, tool, etc. Requirement:a necessity Process Decide ifanymanagement action isnecessaryin wilderness, and, if so, thendetermining what would be theleastamount of an otherwise prohibited use.

  5. Minimum Requirements Analysis How is a Minimum Requirements Decision made? The 2 Step Process Step 1: Determine if any administrative action is necessary. • The minimum requirement Step 2: Determine the minimum activity. • The minimum tool

  6. Minimum Requirements Analysis How is a Minimum Requirements Decision made? Step 1: Determine if anyadministrative action is necessary. • Briefly describe the situation that may prompt action and describe why it is a problem or issue. Example: “The trail bridge is out and replacement is needed because…(resource impacts, high use, no safe crossing, etc.)” Avoid: “We need to use a helicopter to fly in a new bridge.”

  7. Minimum Requirements Analysis How is a Minimum Requirements Decision made? Step 1: Determine if any administrative action is necessary. A. Options outside of wilderness

  8. Minimum Requirements Analysis How is a Minimum Requirements Decision made? Step 1: Determine if any administrative action is necessary. B. Valid existing rights/special provisions in wilderness legislation (mining, access, water, grazing, etc.)

  9. Minimum Requirements Analysis How is a Minimum Requirements Decision made? Step 1: Determine if any administrative action is necessary. C. Requirements of other legislation (ESA, ARPA, NHPA, ANILCA, Dam Safety Act, etc.)

  10. Minimum Requirements Analysis How is a Minimum Requirements Decision made? • Federal • Tribal • State Step 1: Determine if any administrative action is necessary: D. Other guidance (policy, plans, agreements, etc.)

  11. Minimum Requirements Analysis Examples: Other guidance (policy, plans, agreements) FS Policy, forest plan, wilderness, fire, weed treatment plans, species conservation plans, etc.

  12. Minimum Requirements Analysis How is a Minimum Requirements Decision Made? Step 1: Determine if any administrative action is necessary to: E. Preserve Wilderness Character - untrammeled(uncontrolled, un-manipulated) - undeveloped (removal of a structure or installation) - natural(restoration of natural conditions) • i.e. non-native invasive species treatment, natural role of fire, listed species recovery, etc. - outstanding opportunities for solitude or a primitive and unconfined type of recreation • i.e. trail maintenance

  13. Minimum Requirements Analysis How is a Minimum Requirements Decision Made? Step 1: Determine if any administrative action is necessary to support: F. Public Purposes - recreation - scenic - scientific - education - conservation - historical use

  14. Minimum Requirements Analysis How is a Minimum Requirements Decision made? Step 1:Determine if any administrative action is necessary. A. Options outside of wilderness B. Valid existing rights/special provisions in wilderness laws C. Requirements of other laws D. Other guidance (policy, plans, etc.) E. Preserve wilderness character F. Public purposes of wilderness Conclusion: Is any administrative action necessary?

  15. Minimum Requirements Analysis How is a Minimum Requirements Decision made? Using a two step process: Step 1:Determine if any administrative action is necessary. Example conclusion: Some type of action is necessary Then: Step 2: Determine the minimum activity. A. Describe alternatives B. Compare alternatives

  16. Minimum Requirements Analysis How is a Minimum Requirements Decision Made? • Non-motorized, non-mechanical, no structures, or installations, etc. • Motorized equipment, mechanical transport, structures, installations, etc. • Other methods or combination of methods that minimize prohibited uses • No action (optional) Step 2: Determine the minimum activity (the method or tool). A. Describe alternative activities (including mitigation)

  17. Trail Maintenance Example Motorized Alternative No Action Proposed Action Non-motorized Alternative A. Describe alternative activities (including mitigation)

  18. Minimum Requirements Analysis How is a Minimum Requirements Decision Made? • Criteria: • wilderness character • heritage and cultural resources • maintaining traditional skills • special provisions • economics & time • safety • area-specific factors? Step 2: Determine the minimum activity (the method or tool). B. Comparison of Alternatives

  19. Minimum Requirements Analysis How is a Minimum Requirements Decision Made? A. Describe alternative actions B. Comparison of Alternatives Decision:What is the minimum activity? The rationale for the decision must be based on law and agency policy. Step 2: Determine the minimum activity (the method or tool).

  20. Minimum Requirements Analysis PrimaryDecicion Rationale: • Requirements of applicable federal laws • The Wilderness Act - preservation of wilderness character • Untrammeled, Undeveloped, Natural, Solitude or Primitive Recreation Opportunities • ESA, NHPA, ARPA, NEPA, etc. • Safety • Use and development of traditional skills

  21. Minimum Requirements Analysis "Examine each question in terms of what is ethically and aesthetically right, as well as what is economically expedient." -Aldo Leopold NotAcceptable as the ONLYRationale: • Cost and time constraints: • “Economics, comfort, convenience or commercial value are not standards of management for wilderness.” (Policy FSM 2320.6) Avoid misconceptions about traditional skills • Safety – traditional tools are safer • Efficiency – trained crews nearly as fast • Cost – Comparable to motorized equipment

  22. Minimum Requirements Analysis How is a Minimum Requirements Decision Made? Use a two step process Step 1:Determine if any administrative action is necessary. A. Options outside of wilderness B. Valid existing rights/special provisions C. Requirements of other legislation D. Other guidance E. Wilderness character F. Public purposes of wilderness Conclusion: Is the action necessary? Step 2:Determine the minimum activity. A. Describe alternatives B. Compare alternatives Decision: What is the minimum activity (method or tool)? Use rationale for the decision based on law and agency policy.

  23. Minimum Requirements Analysis How is a Minimum Requirements Determination Made? Now all that’s left is to get the appropriate review and approval and you’re good to go.

More Related