450 likes | 474 Views
Joint WRAP Update Meeting III. January 26, 2009. WELCOME…. Thank you for joining us Please sign in Tonight’s topic… How we plan to meet the County’s future water needs while protecting the aquifer for generations to follow. Key requirements of WRAP Part II.
E N D
Joint WRAP Update Meeting III January 26, 2009
WELCOME… • Thank you for joining us • Please sign in • Tonight’s topic… How we plan to meet the County’s future water needs while protecting the aquifer for generations to follow.
Key requirements of WRAP Part II • Descriptions of new water supply sources and strategies to meet projected water demands; • Description of infrastructure requirements for each new water supply source; • Timelines for design/construction of infrastructure projects; • A letter from a surface water or alternative source supplier indicating availability of water and willingness to meet the LVGUs’ demands, as applicable;
Key Requirements of WRAP Part II Continued… • Description of costs and methods of financing water supply and infrastructure; • Preliminary engineering of infrastructure necessary to meet water demands for the January 1, 2015; • Conceptual engineering of the infra-structure necessary to meet future water demands beyond the 1/1/2015 initial conversion date; • A copy of the written agreements for participants in a Joint WRAP.
Section 3 – Evidence of Availability and Willingness to Supply Water Memorandum of Understanding is being developed between the City of Houston and SJRA.
Section 4 – Infrastructure 2015 – Raw water intake structure and water treatment plant at Lake Conroe. In the first phase, begin delivering surface water to The Woodlands and City of Conroe.
Section 4 – Infrastructure 2015 – 2045
Section 5 – Program Costs • CAPITAL COSTS: • Planning, permitting, design • and special studies/services • Construction • Construction management, • testing and inspection • Environmental mitigation • Land/easements • Inflation • Legal and Financing • Contingencies
Section 5 – Program Costs • Debt Service • Operations and Maintenance • Purchased Water (Including reservation fees) • Reserve Costs
Section 6 – Financing Alternatives • Potential Financing Alternatives Include: • Open Market Bonds • TWDB WIF Deferred Low Interest Loans • TWDB WIF Construction Loans • Other State/Federal Programs
Section 6 – Financing Alternatives • Potential Payment Alternatives Include: • Legislated GRP fee • Long-term contract between SJRA and Customers
Section 7 – Program Schedule -- Traditional Project Delivery
You are invited to attend an important meeting! • Water Conservation Workshop • February 12, 2009 • 9 a.m. – 4 p.m. • Hosted and co-sponsored by • SJRA,WJPA, LSGCD • Featuring…. • State and National Speakers • No Admission Charge • Additional Details, Agenda, • Speaker Information Online • Register Online… • www.WaterConservationWorkshops.com
Potential Source Study Potential Source Study
Potential Source Study SJRA Water Rights
Surface Water Supply Demands Trinity River Lake Livingston Lake Conroe Montgomery County 25,000 afpy– 2015 50,000 afpy – 2025 75,000 afpy– 2035 100,000 afpy- 2045 West Fork San Jacinto River Trinity River Luce Bayou Lake Houston Highlands 80,000 afpy Highlands Reservoir
Water Rights Trade SJRA Trinity River Rights for COH Lake Conroe Rights Trinity River Lake Livingston Lake Conroe COH Lake Conroe Rights SJRA West Fork San Jacinto River Trinity River Luce Bayou Lake Houston SJRA Trinity Rights COH Highlands Reservoir
Trinity River Water Rights Trade SJRA San Jacinto Rights for COH Lake Conroe Rights Lake Livingston Lake Conroe COH Lake Conroe Rights SJRA West Fork San Jacinto River Luce Bayou Trinity River Lake Houston SJRA San Jacinto Rights COH Highlands Reservoir
Trinity River Purchase of COH Lake Conroe Rights Lake Livingston Lake Conroe COH Lake Conroe Rights $ SJRA COH West Fork San Jacinto River Luce Bayou Trinity River Lake Houston Highlands Reservoir
SJRA Participation in Luce Bayou for COH Lake Conroe Water Trinity River Lake Livingston Lake Conroe COH Lake Conroe Water SJRA $ SJRA COH West Fork San Jacinto River Luce Bayou Trinity River Lake Houston Highlands Reservoir
Long-term Water Supply Contract With NHCRWA Trinity River Lake Livingston Lake Conroe West Fork San Jacinto River SJRA Luce Bayou Trinity River $ Lake Houston NHCRWA COH Highlands Reservoir
Long-term Water Supply Contract For COH Lake Conroe Water Trinity River Lake Livingston Lake Conroe COH Lake Conroe Water $ COH SJRA West Fork San Jacinto River Luce Bayou Trinity River Lake Houston Highlands Reservoir
Long-term Water Supply Contract For TRA Trinity River Water Trinity River TRA Water Lake Livingston Lake Conroe $ TRA SJRA West Fork San Jacinto River Luce Bayou Trinity River Lake Houston Highlands Reservoir
Trinity River TRA Water Lake Livingston Lake Conroe COH Lake Conroe Water TRA COH $ SJRA West Fork San Jacinto River Luce Bayou Long-term Water Supply Contract For COH Lake Conroe Water and TRA Replacement Water Trinity River Lake Houston Highlands Reservoir
SJRA Trinity River Rights for Montgomery County Trinity River Lake Livingston Lake Conroe Trinity River SJRA Trinity Rights Luce Bayou West Fork San Jacinto River Lake Houston Highlands Reservoir
Potential Source Study Capital Costs