An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CP144260Campus Utility System Pre-Submittal Conference August 26, 2011

  2. Overview • Introductory Remarks / Submittal Requirements • Program Goals • Planning Goals • Construction Goals • Questions and Answers • Facility Tour

  3. IntroductionsSubmittal Requirements Katherine A. Dunklau, Construction Phase Manager

  4. Project Team (to date)

  5. CM/GC RFQ Submittal • Two Step Process • Prequalification Submittal • Direct, Concise, Organized • Short list – interviews and fee proposal • Fee Proposal – one copy, sealed • Minimum Requirements • Addenda

  6. Program Goals Ed Barton, Lutz Daily & Brain Bryan Birosak, Director, Power House

  7. Project Scope Multi-phase project • Renovations to existing plant (WDEP) • New energy plant (EDEP) • CW distribution at Kittredge • New/renovations to existing distribution system

  8. Planning Goals Phil Simpson, Planning Phase Manager

  9. Planning Phase Responsibilities • Design responsibilities • Manage Schematic Design & Design Development • Secure entitlements related to design • Ensure programmatic objectives & entitlements are met • Construction responsibilities • Exterior material approvals • Quality assurance for stonework • Quality assurance for landscape & site features • Communication interface

  10. Important items from a CM/GC • Transparency • Partnering session • Open detail in estimates • Advising the design team between formal reviews • Constructability Review • Are we realistic? • Construction Mitigation • Interface & communication planning • Sexual Harassment policies • Staging requirements • Landscape preservation & restoration • Sustainability practices

  11. Construction Goals Katherine A. Dunklau, Construction Phase Manager

  12. Preliminary Schedule

  13. Questions katherine.dunklau@colorado.edu

  14. Site walk Distribution Pathway – Phil Simpson WDEP – Bryan Birosak