An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fort Stanwix National Monument Energy Audit Detailed Design Review Friday, February 20th, 2009 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453

  2. Project Description

  3. Customer Needs • Rational for Customer Needs based on: • Project readiness packet • December 2nd phone interview with FSNM – Debbie Conway • December 13th onsite visit with Debbie and Todd • Key statement: reduce current total cost of energy at FSNM to offset the impact of potential ‘green’ energy opportunities and conservation measures

  4. Budget Update • Modeling Software - $0 • Free download from DOE • Travel – 2 onsite visits • 1st visit: 1 car R/T, no meals • 2nd visit: 2 cars R/T, meals • MSD2 Direct Costs • Renewable demo supplies

  5. MSD1 Project Task Status

  6. MSD2 Project Tasks/Objectives

  7. Moving Forward - Spring Quarter • Order Solar System Wk 11 [Winter Quarter] • Determine energy savings per ECM with detailed breakdown • Economic Analysis • Energy Assessment Report • Install Solar System • Installation, maintenance, test plan

  8. Risks • Robustness of renewable demo • Lead time on Solar demo parts • Balancing education and entertainment aspects • Detailed ECM impacts • eQuest model assumptions • Funding • Proximity to FSNM