An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fort Stanwix National Monument Energy Audit Team Organization and Roles Preliminary Work Breakdown Structure Customer: Debbie Conway Guide: Brian Thorn P09453

  2. Project Manager (ISE): Kyle Mininni Chief Engineer (ME): Rob Hudson Assistant Lead (ME): Ryan Anderson EE: Joanne Okvath ISE: Mauricio Pommier Team Organization Fort Stanwix Energy Audit

  3. Simple Preliminary Work Breakdown Structure Ft. Stanwix Energy Audit Implement pilot energy project Assessment report Evaluate current ESCO & billing structure Design/Propose Renewable energy project Determine energy saving opportunities Sustainable feasibility Research Data Analysis On-Site Assessment Pre-assessment data collection Energy Audit Research

  4. Aggregate Work Breakdown Structure Ft. Stanwix Energy Audit Implement pilot renewable energy project Assessment report Design/Propose Renewable energy project Costs/Benefits of new vs. current ESCO & billing structure Generate Potential Energy saving opportunities ID Feasible renewable project options Energy Audit Assessment Investigate alternative ESCO’s billing structure Economic input/output & ROI analysis On-Site Assessment Analyze Data Develop comprehensive database of alternative ESCOs Analyze current ESCO & billing structure Energy Audit Research Collect Data

  5. Component Work Breakdown Structure Collect Data 2007 Monthly Gas/Electric Billing Breakdown Itemized monthly gas/electric bills Fort & Maintenance shed blueprints Willett Center blueprints w/ HVAC system & 2007 renovations System Specifications & Equipment List Water & Sewage Utility Bills Analyze Data Investigate Modeling Software Create Gas/Electric consumption model Create water/sewage consumption model Graphs & Charts of data

  6. Component Work Breakdown Structure Energy Audit Assessment Lighting Assessment Boil & Steam System HVAC System Assessment Analyze Equipment Usage Site Control System Building Insulation Lighting Control Investigate Seasonal Changes Current Usage Equipment Utilizing/consumption Heating & Cooling Exchange Efficiency Analysis Investigate alternative Kitchen Appliances Office Equipment Review of Energy billing Structure Investigate alternative billing structures of ESCOs Analyze current billing structure w/ green alternative Cost/Benefit analysis of National Grid Green Alternative Investigate alternative ESCOs Complete list of ESCOs Contact ESCO to obtain billing structure

  7. Component Work Breakdown Structure Assessment Report Analyses used to obtain opportunities Propose short-term opportunities Propose long-term opportunities Analyses used to obtain opportunities