Building Knowledge Mobilization Plans

Building Knowledge Mobilization Plans. OISE WORKSHOP 14/09/2011 Amanda Cooper. Conceptualizing Knowledge Mobilization. 5 Prong Organizing KT Framework . Strategy Approach to building a KM Plan. Function Approach to building a KM Plan. KNOWLEDGE MOBILIZATION. RESEARCH USE.

meryle
Download Presentation

Building Knowledge Mobilization Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Knowledge MobilizationPlans OISE WORKSHOP 14/09/2011 Amanda Cooper

  2. Conceptualizing Knowledge Mobilization 5 Prong Organizing KT Framework Strategy Approach to building a KM Plan Function Approach to building a KM Plan

  3. KNOWLEDGE MOBILIZATION RESEARCH USE RESEARCH PRODUCTION INTERMEDIARIES KM SOCIAL CONTEXT TIME (Levin, 2004)

  4. 5 Prong KT Organizing Framework • MESSAGE • What should be transferred to decision makers? (p.223) • TARGET AUDIENCE • To whom should research knowledge be transferred? (p.224) • MESSENGER • By whom should research knowledge be transferred? (p.225) • KT PROCESS • How should research knowledge be transferred? (p.226) • EVALUATION • With what effect should research knowledge be transferred? (p.227) (Lavis et al., 2003)

  5. BRAINSTORM (10 Minutes)5 Prong Framework for Building your KM Plan... Spend 2-3 minutes jotting down bullet points for your research using Lavis et al. Framework Spend 5 minutes discussing in group Group debrief, a few points from the floor

  6. Strategy Approach KM Products KM Events KM Networks (Cooper & Levin, 2010)

  7. BRAINSTORM (10 Minutes)Strategy Approach to Building your KM Plan... Spend 2-3 minutes jotting down bullet points for your research using Products, Events, Networks Spend 5 minutes discussing in group Group debrief, a few points from the floor

  8. (Cooper & Levin, 2010)

  9. (Cooper , 2011)

  10. BRAINSTORM (10 Minutes)Function Approach to Building your KM Plan... Spend 2-3 minutes jotting down bullet points for your research using Functions or Gaps you are trying to address Spend 5 minutes discussing in group Group debrief, a few points from the floor

  11. Some Tips • Identify existing mechanisms: • What websites, events, and networks already exist in this area? • What publications, newsletters are already distributed to target audiences? Are there ways to contribute to these existing vehicles (school newsletter, e-bulletins, RSS feeds)? • YOU GET MORE SPREAD & IMPACT THROUGH PEOPLE, PROCESSES, and STRUCTURES THAT ARE ALREADY EMBEDDED IN SYSTEMS!! • Creating plans for sustainability the extend beyond the funding window • At a conference, having structured break out time to create some Communities of Practice specifically around KM on a particular issue

  12. Thank You! ••••••••••••••••••••••••••••••••••