1 / 35

In re The LAX Master Plan

In re The LAX Master Plan. What a long, strange trip it … IS. Regional Setting. Large, Complex Region. SCAG (2015) RTP Aviation Scenarios. Need for Plan. Last Master Plan in 1981 for Olympics Passenger Growth Cargo Growth Regional (Background) Growth. A Long, Continuing Process.

micol
Download Presentation

In re The LAX Master Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. In re The LAX Master Plan • What a long, strange trip it … IS

  2. Regional Setting • Large, Complex Region

  3. SCAG (2015) RTP Aviation Scenarios

  4. Need for Plan • Last Master Plan in 1981 for Olympics • Passenger Growth • Cargo Growth • Regional (Background) Growth

  5. A Long, Continuing Process

  6. And then… • Comment Period Extended • Comment Period Extended • Comment Period Extended • “ 9/11” • 2001/09 – Mayor Hahn’s “Safety Alternative” • 2001/12 Hold – Refinement • 2002/03 Resume

  7. Model Timeline • 1995 • RISC (IBM RS6000-C10) • AIX Unix • Emme/2 Version 7 • Single Scenario AM/AP/PM • 2 Classes • Base Year

  8. Model Timeline • ~1996 • PC • Windows 95 (?) • Emme/2 Version 7 • Single Scenario AM/AP/PM • 2 Classes • 2 Horizon Years (2005/2015)

  9. Model Timeline • ~1997 • PC • Windows 95 • Emme/2 Version 8 • Single Scenario AM/AP/PM • 2 Classes • 2 Horizon Years (2005/2015)

  10. Model Timeline • 1997/10 • PC • Windows 95 • Emme/2 Version 8 • Separate Scenarios AM,AP,PM • 10 Classes • 2 Horizon Years (2005/2015)

  11. Model Timeline • 1998 • 3 PCs in mini-Network • Windows 95 • Emme/2 Version 8 • Separate Scenarios AM,AP,PM • 10 Classes • 2 Horizon Years (2005/2015) • Approx. 8 Hrs in Parallel per Year

  12. Model Timeline • 2001 • Laptop PC • Windows 2000 • Emme/2 Version 9 • Separate Scenarios AM,AP,PM • 10 Classes • 2 Horizon Years (2005/2015) • Approx. 9 Hrs in Series per Year

  13. The Ten Classes • Passenger LOV, HOV • Employee LOV, HOV • Cargo Car (LOV), Truck PCE • Other (Project) LOV, HOV • Background LOV, HOV

  14. Model Elements • Zones • LAX • From Aviation Consultant • PV • From Phase I of (Adjacent) Project EIR • Region • From SE Data – “Normal” model • Post Processor • “Pivot” model links into Turning movements

  15. Pre-Run Checklist

  16. RunMacro-1 ~/===================================================== ~/run4438.mac 2002/03/14 ~/ ~/run model chain - 10 Class - Phase 3I - test11 AltD ~/use tst3adpm.mac ~/use Baseline SE se4ad.311 ~/ new tgp4.mac ~/----------------------------------------------------- s=4438 c=begin run4438.mac p=0 ~o=32 ~/ ~/-------------------------- ~<in15/ld1597ms.mac ~/-------------------------- ~/pm ~/-------------------------- c=begin pm i=0 ~<in95/killmf1.mac ~<in95/load1 ~/ ~<in15/p4pv15pm.mac ~<in15/AltD/laxadpm.mac ~/

  17. RunMacro-2 ~<mac/0skimpm3.mac ~<mac/1tgp4.mac se4ad.311 ~<mac/2dist.mac ~/*** New TGen "Model" Telecommute %ages: 1990/5=0.019 2000=0.046 2010=0.056 2015=0.056 ~/*** Background HOV %ages, 2005 (2+): AM= PM= MD= ~/*** Background HOV %ages, 2015 (3+): AM=0.0688 PM=0.1060 MD=0.1283 ~<mac/3vehpm.mac 0.056 0.0688 ~/-------------------------- c=begin pm i=1 ~<mac/0iterskm.mac ~<mac/0skimpm3.mac ~<mac/1tgp4.mac se4ad.311 ~<mac/2dist.mac ~/*** New TGen "Model" Telecommute %ages: 1990/5=0.019 2000=0.046 2010=0.056 2015=0.056 ~/*** Background HOV %ages, 2005 (2+): AM= PM= MD= ~/*** Background HOV %ages, 2015 (3+): AM=0.0688 PM=0.1060 MD=0.1283 ~<mac/3vehpm.mac 0.056 0.0688 ~/-------------------------- c=begin pm i=2 ~<mac/0iterskm.mac ~<mac/0skimpm3.mac ~<mac/1tgp4.mac se4ad.311 ~<mac/2dist.mac ~/*** New TGen "Model" Telecommute %ages: 1990/5=0.019 2000=0.046 2010=0.056 2015=0.056 ~/*** Background HOV %ages, 2005 (2+): AM= PM= MD= ~/*** Background HOV %ages, 2015 (3+): AM=0.0688 PM=0.1060 MD=0.1283 ~<mac/3vehpm.mac 0.056 0.0688

  18. RunMacro-3 ~<mac/4pm.mac ~<mac/5odnew.mac ~<mac/5plotspm.mac ~<mac/5volpm.mac ~<mac/5tabl1pm.mac ~<mac/5truck.mac pm ~<mac/5spd.mac pm ~/-------------------------- ~<mac/vmt10cl.mac pm ad ~<mac/vmt10clb.mac pm ad ~<mac/vmt10clv.mac pm ad ~<mac/vht10cl.mac pm ad ~<mac/vht10clb.mac pm ad ~<mac/vht10clv.mac pm ad ~/-------------------------- ~/summ trn ~<mac/mktrnpt.mac ~<mac/summc.mac ~<mac/summj.mac ~<mac/summm.mac ~<mac/summn.mac ~/-------------------------- c=end of pm ~/-------------------------- c=end of run4438.mac ~/--------------------------

  19. PostHealth

  20. 2 Baselines, 3 Alternatives • Adjusted Environmental • CEQA • “1995 Airport” with Future Background • No Action/No Project • NEPA • “Do Nothing (Future)” Airport with Future Background • Alt A • Alt B • Alt C

  21. Adj.Env. NA/NP Landuse

  22. Alt C Landuse

  23. AdjEnv–Airport Trips

  24. 2015 NA/NP–Airport Trips

  25. 2015 Alt C –Airport Trips

  26. NANP - Network

  27. Alt C – Network

  28. NA/NP Assignment

  29. Alt C – Assignment

  30. Alt C – Difference TotalV

  31. Alt C – Difference Total

  32. Alt C – Difference LAX

  33. Alt C – Difference Background

  34. Impacts • Vs Adjusted Environmental

  35. Impacts • Vs NA/NP

More Related