An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Estates Senior Management Meeting 27th November 2013

  2. Last 3 monthsActions update from previous report • EcoCampus Gold- Ben and Wale presented at October ESM • Positive feedback from awareness week in October and OGEC launch • Review of web content and communications plan- developing as part of larger piece of work with interns • VAT return from British Gas- still outstanding • Voltage optimisation at SoM- Technical appraisal completed and order to be placed. • Building User Groups- as part of engagement/comms piece • Solar PVs on campus- now live • JBP Library CHP Project- 2 CHPs under consideration • Richmond Plant Room works- on-going • Annual report- Draft completed- needs finalising • Edd:e metering on fume cupboards- awaiting costs from Utility Wise • BMS installation to JBP Library- Phase 1 extension to be completed 20/12/13 • BMS moved to server based system- On-going, 10% gas reduction target • Emergency lighting and controls in JBPL- Phase 1 to be completed next quarter • Re-commissioning of Student Central vent- completed • On-going work with Council Additional notes • Green Gown Awards- JBP Library GLEE project won Facilities and Services category

  3. Performance Pressure Points Gas pressure and G59 issues causing CHP engine to trip- up to 20 times in last month • Recalculated baseline in line with changes in DEFRA conversion factors • YTD: August-October • Gas YTD: 9% increase from 2005/6 • Electricity YTD: 42% decrease from 2005/6 • Water YTD: 30% decrease in water usage from 2009/10 • Waste YTD: Diversion from landfill 77.4% • Carbon YTD: 29% reduction in scope 1 and 2 carbon Successes JBP Library DEC rated B36 2 days in November (Sundays) where City Campus did not take any electricity from the grid- demand provided by CHP Scope 1&2 Carbon -29% 30% decrease in water 77.4% Diversion from landfill

  4. Next 3 months • ISO50001- Energy Management System • Two projects lined up for interns starting Jan 14- Digital Media project and Future Engagement Research Project • EcoCampus Gold- Targeted for completion November 2014 • Feasibility study on biofuel CHP serving district heating • Finalise Annual Report • Re-align Carbon Management Plan with off-grid strategy • OGEC- 2014-15 model to be agreed • Individual Building Action Plans to be produced • Model future heat load of Richmond post-cladding • Performance against design evaluation of the Bright Building • Plant performance review at Emm Lane • Optimisation of CHP operation with target of 10% increased output • Student tour of CHP plant- School of Engineering