1 / 12

Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section

Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf / Dollymount (Wooden Bridge to Causeway Road). Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD. Roads Traffic

minowa
Download Presentation

Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf / Dollymount (Wooden Bridge to Causeway Road) Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section

  2. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

  3. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD Roads • Traffic • Condition Sea Defences • Erosion • Flooding Ecology • SPA • SCA • pNHA

  4. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

  5. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

  6. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

  7. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

  8. S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD NEXT STEPS • Planning Application / Public Display • Cost • Construction mid 2013

  9. CONCLUSION • Interim Solution • Deliverable in Short Term • Cycling • Walking • Additional flood defence • Coastal erosion • Trunk Water Main QUESTIONS ?

More Related