1 / 3

XIS meeting at ISAS

XIS meeting at ISAS. Delta from October SWG & Things to be discussed. Calibration Gain/CTI Correction (rev0.3->0.6) QE degradation (E0102, RXJ1856 ,Cyg loop, Earth ) Ex(PI)-PHA relation Background Study Data-Base Operation DE software update Camera Body Temp and TEC Bakeout Plan.

miracle
Download Presentation

XIS meeting at ISAS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XIS meeting at ISAS

  2. Delta from October SWG & Things to be discussed. • Calibration • Gain/CTI Correction (rev0.3->0.6) • QE degradation (E0102,RXJ1856,Cyg loop, Earth) • Ex(PI)-PHA relation • Background StudyData-Base • Operation • DE software update • Camera Body Temp and TEC • Bakeout Plan

  3. Calibration Status and Plan • QE degradation are going to be modeled as a function of time and distance from the FOV center.E0102, RXJ1856, DarkEarth. => arf-builder. • QE at C-K on the ground is ½ of the orbital QE? • CTI correction was introduced in rev0.6 processing. Need to be checked in various sources. (Energy, time, position dependence) Feedback from SWG is expected. • PHA->PI conversion (xispi) should be upgraded. • Charge Trail Correction parameters should be checked with 2006 data. • Resolution decrease should be included in the response. rmf-builder can do it. CI measurement and CTI correction by each column might be used to save the degradation • Background data base is under construction. BadColumns data base should be updated. • Data-Selection Criteria will be revised from (ELV>5 && DYE_ELV>20) to (ELV>5).

More Related