Update 2 Sarah Mercier

Update 2 Sarah Mercier. Summary. Current status Implemented features Known bugs Changes from original plan Prototype demo Before/after GAE/Play!/Siena How it works with example Plan for next semester Remaining features Bug fixes Timeline. Current status. Implemented features

Download Presentation

Update 2 Sarah Mercier

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update 2 Sarah Mercier

  2. Summary • Current status • Implemented features • Known bugs • Changes from original plan • Prototype demo • Before/after • GAE/Play!/Siena • How it works with example • Plan for next semester • Remaining features • Bug fixes • Timeline

  3. Current status • Implemented features • Login with email address • User-specific content • User role dictates content and permissions • Employee, Client, Project administration • Time • Logging • Copy day • Known bugs • Editing time entries: wrong week selected • Clearing of database upon deployment of new/updated version • Closed projects listed in billing for all users • Doesn’t check user email is actually allowed to access TT

  4. Current status • Changes from original plan • MVC framework • Siena plugin to make datastore easier to work with • Android app? • Discovered most people at work don’t have Android phones • Possibly mobile version of site, if time allows

  5. Before/after

  6. GAE/Play!/Siena framework • How it works

  7. Demo!

  8. Plan for next semester • Remaining features • Time submission/approval • Notifications • Report generation • Client summaries • Project manager summaries • Executive summaries • Exportation of data • Mail/Google Talk modules • Branding

  9. Plan for next semester • Bug fixes • Fix wrong time selected • Fix datastore wipe upon deployment • Possibly default values populate database upon deployment • Fix closed project listing • Check for property when getting list of projects • Fix user detection • If can populate database with users upon deployment, should be easy to do

  10. Plan for next semester • Timeline • December/Beginning Spring 2011 • Bug fixes • Time submission/approval • Notifications • End of February • Report generation and summaries • Data export • End of March • Google Mail/Talk Modules • End of April • Branding • End of Semester • Mobile version of application (possibly)