Sarasota Memorial Health Care System Projects Update Neighborhood Advisory Council June 24, 2010

Sarasota Memorial Health Care System Projects Update Neighborhood Advisory Council June 24, 2010. Agenda:. CEP Status Construction Phasing Construction Status Surgery Vertical Expansion Bed Tower Package Medical Arts Building Construction Web Cam. CEP Status:.

muncel
Download Presentation

Sarasota Memorial Health Care System Projects Update Neighborhood Advisory Council June 24, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sarasota Memorial HealthCare SystemProjects UpdateNeighborhood Advisory CouncilJune 24, 2010

  2. Agenda: • CEP Status • Construction Phasing • Construction Status • Surgery Vertical Expansion • Bed Tower Package • Medical Arts Building • Construction Web Cam

  3. CEP Status: • Building Construction is complete • Sound testing is complete and in compliance. • Fully operational CEP: Done!

  4. Project Phasing – 2 New CEP Completed Information Systems Complete – 5-Service Central Receiving Complete – 1-Waldemere Wound Care – 2-Waldemere On-Call – 4-Central Observation Complete – 9-East Surgery/CS Vertical Expansion Interim Moves for Surgery Support & Pathology Temporary ECC Turn-around & Canopy Temporary Entry/Exit at Waldemere Garage Demolish Old CEP Temporary Main Entrance Canopy

  5. Project Phasing – 3 Wound Care – 2-Waldemere Temp Main Entry Turn-around & Canopy On-Call – 3-East Surgery/CS Vertical Expansion Interim Moves for Surgery Support & Pathology Temporary ECC Turn-around & Canopy

  6. Project Phasing – 4 Wound Care – 2-Waldemere Temp Main Entry Turn-around & Canopy On-Call – 3-East Surgery/CS Vertical Expansion Moves for Surgery Support & Pathology Complete Demolish Portion of Critical Care Tower Temporary ECC Turn-around & Canopy Complete Sitework & Temporary Drive

  7. Project Phasing – 5 Temp Main Entry Turn-around & Canopy Demolish Northeast Tower Main Entry Canopy Structure for Bridge, Elevator & Stair On-Call – 3-East Surgery/CS Vertical Expansion ECC Vestibule, Canopy and Drop-off Complete Sitework & Temporary Drive

  8. Surgery Vertical Expansion Status: • The Crane is set up on Arlington St. • Structural Steel Erection is in progress. • Construction of Bridge across Arlington St. will begin in August

  9. Bed Tower Status: • Old CEP is Demolished • Temporary ECC Entry Drive Complete • Temporary ECC Entry Canopy Open • Hawthorne Street at US 41 is Closed • Underground Utilities in Progress

  10. Bed Tower Status: • Temporary Garage Entry/Exit at Waldemere Street • Temporary Main Entry Canopy in Progress

  11. Medical Arts Office Building Update

  12. HVI WebCam Link – http://www.smh.com/ • East Tower “green camera” Coming Soon