An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Plan for DCS projectL.Jirden 10.9.01 • Initial steps • Strategy • Project phases and system components • Example of a design phase • Planning • Conclusion DCS Workshop - L.Jirdén

  2. DCS Work Plan • What is a Work Plan? • It defines the ultimate goal and all the intermediate steps to be performed, when and by whom to achieve the goal. • Ultimate goal: A working DCS ready for exploitation end 2005 ! DCS Workshop - L.Jirdén

  3. Initial Steps • Agree on project definition • Establish resources, create ACC team • Establish ACB • Define organization of work • Identify applications for prototyping • Define milestones and detailed planning • Start regular progress meetings DCS Workshop - L.Jirdén

  4. Initial Steps • Agree on project definition • Accepted by TB end may • Establish resources, create ACC team • Lennart Jirden • Andre Augustinus • Tarek Ben Ahmed 50% • Sorina Popescu (PJAS) • Physicist/engineer vacancy • Establish ALICE controls board • DCS detector contact people nominated DCS Workshop - L.Jirdén

  5. Initial steps Cont. • Define organization of work • We need to set up a “Work Plan” • Start at this meeting • Identify applications for prototyping • Start at this meeting (Andres presentation) • Define milestones and detailed planning • Start at this meeting • Start regular progress meetings • Start later DCS Workshop - L.Jirdén

  6. Global Layout PrimaryServices Associated Projects Supervisory Function magnet LHC ECS gas Offline electricity Trigger cooling DCS safety DAQ access ITS TPC MUON pixel strip drift T T p hv hv hv hv hv lv lv lv lv lv Detectors DCS Workshop - L.Jirdén

  7. Strategy • A. Process control for the detectors • Identify common requirements • Design “ALICE common solutions” • Pilot applications - test cases • Collaboration ACC – detector groups • Aim to cover all main functions – minimize number of special cases • B. Services • Determine required functions and responsibilities • Pilot applications – test cases • Collaboration ACC – detector groups – CERN services DCS Workshop - L.Jirdén

  8. Strategy • C. Operations and supervisory functions • Link detector process control to supervisory layer • Implement vertical slice & use PVSS framework tools • Pilot applications – test cases • Collaboration ACC – detector group – JCOP • D. Links to ALICE DAQ, TRG, offline • Initiate common projects • Pilot applications – test cases • Collaboration ACC – DAQ, TRG, offline – detector group DCS Workshop - L.Jirdén

  9. Strategy • E. Links to LHC • Experiment common project (JCOP) • F. Controls Infrastructure • Define requirements • Collaboration ACC – DAQ – Infrastructure group DCS Workshop - L.Jirdén

  10. Organization Of Work • Typical project phases • Design • Production/purchasing • Installation • Commissioning • Operation DCS Workshop - L.Jirdén

  11. Organization of work Cont. • Controls System main components • Detector sub systems. • HV, LV, cooling, gas, FE electronics, alignment, misc. • Links to Primary Services. • Magnet, primary gas, primary electricity, primary cooling, safety, access. • Links to associated systems. • DAQ, TRG, offline, LHC. • Operations and supervisory functions. • Configuration, logging, archiving, alarms, etc. • Controls infrastructure • XCR, networks, servers, rack space, etc. DCS Workshop - L.Jirdén

  12. Organization Of Work • Typical project phases • Design • Production/purchasing • Installation • Commissioning • Operation • DCS Components • Detector sub systems • Links to Primary Services. • Links to associated systems. • Operations and supervisory functions. • Controls infrastructure DCS Workshop - L.Jirdén

  13. Design Sub System controls • First • Fix the device to be controlled • Then • Design the controls part DCS Workshop - L.Jirdén

  14. Design Sub System controls • Fix the device to be controlled • Question: Common Specification and purchase? • For which devices? • Functional specification and tender or single source purchasing? • Purchase of test units • Evaluation and test • Device fixed or device control fixed DCS Workshop - L.Jirdén

  15. Design Sub System controls • Design of controls part • User requirements document • How detailed? TPC field cage example – template. • Boundary conditions • CERN standards – YES! • Which ALICE standards? • PLC’s, field bus, sensors, gas w.g. standards, etc. • common purchasing? • To be defined first! • Process Control layout projected • Prototype and test • Link to supervisory layer – integrate with framework • Prototype and test DCS Workshop - L.Jirdén

  16. When and by Whom? • When? DCS planning! • DCS planning file created • Linked to ALICE wide planning • Input from each detector group required • Steps • Dates • By whom? Responsibilities! • Pilot projects shared ACC – detector group • Otherwise detector groups DCS Workshop - L.Jirdén

  17. DCS Planning 2001 02 03 04 05 06 DESIGN PROD. PURCH. INST. COMM. BEAM OPERAT. DCS Workshop - L.Jirdén

  18. DCS Planning 2001 02 03 04 05 06 DESIGN PROD. PURCH. INST. COMM. BEAM OPERAT. SOLUTION PROJECTED SUPERVISORY LAYER PROTOTYPE & TEST USER REQ. DOC. DCS Workshop - L.Jirdén

  19. Conclusion • DCS project launched – some initial steps now effective • Work plan to be set up – aim for end 2001 • Basic strategy defined • Basic Components and project phases outlined – more details needed! • DCS Planning file created – more details needed! • Input from Detector Groups required! DCS Workshop - L.Jirdén