An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tile Testbeam Program Today’s Plans and Thoughts

  2. Testbeam Program • Tile Goal: 12% of Barrel & EB in beam over next ~3 years: • 8 Barrels + 8 EBAs + 8 EBCs total • Currently Completed: • 1 Barrel + 1 EBA + 3 EBCs • IFA15, IFA24, IFA38, ANL15, JINR18 • Easily can do 1 Barrel + 2 EB’s per period • 2x this also doable if pushed.

  3. H8 Table Setup 20° Incidence 90° Incidence

  4. Typical Run Period • Install Production Drawers! • Traditional Reason for slow progress. • Use Cs to Set HV: Cs target value set to 1.2 pC/GeV. • Beam: • 180 GeV electrons at 20 , ±90 -- 2 EB’s + Barrel • 180 GeV  at ±90, projectively -- 2 EB’s + Barrel • Some 50 GeV electrons, some 180 GeV  • 20 GeV (special beam) electrons at 20, ±90 -- 2 EB’s + Barrel • Start NOW with Module 0. • Electrons,  at ±90.

  5. Some Observations • 50K Triggers/Run. • DAQ-1 => <10 minutes/run. • Almost too fast • Ntuples are huge and difficult to use • 12+ hours per pair of SD’s to complete the standard program. • Possible to exchange modules during our beam period if needed. • EBs Certainly. Barrel more difficult. • Each Period we take 300-500 runs with about 10 million triggers.

  6. Muons vs Cs data RMS = 2.5%

  7. Electrons at  = 20° E/Ebeam =1.140 E/Ebeam =1.004 MC says 20 = 90% 90  1.2 pC/GeV works OK E/Ebeam =1.126 E/Ebeam =0.977 Do we not know our calibration, or do we not know our 20 GeV beam?

  8. Gravy • Best Environment for Production Debugging/Development • First users for DAQ-1 • Drawer Integration • Design errors • Component Integration: HV, Laser, Cs, Digitizers • ….. • More Surprises? • Most assuredly until the end!

  9. EXPECTED STATUS of CALORIMETERS and TABLE AREA - 2002 • Barrel Module 0 will be the bottom module mounted on the table. • 2 layers of Production Modules will be on top: • June • Barrel #34 + EBA# 8 + Late EBC • July • Barrel#1 or #4 + Type n EBC + Type n’ EBC (Standard Drawer Conf) • August • Barrel#6n + EB?? + EB?? • 6 Unique-to-Module Production Drawers Read out Each Beam Period. • June: 6 SD’s needed • July:+4 SD’s • August: +4 SD’s

  10. Scenario to Finish LHCC Recommends SPS Running Continue as: ‘04  ‘03  ‘02 { Well defined 

  11. Low energy studies • Done by other experiments in the past • UA2 (NIM A244 (1984)) • R807 (NIM A241 (1985)) • ZEUS (NIM A290 (1990)) • D0 (FERMILAB-Conf-93/049-E) • CDF (NIM A409 (1998)) • Hadron energy loss by ionization: e/h variation

  12. Low energy at H8 • Currently energies down to 5 GeV for pion beam with poor pion content (1998) • Interest for the calorimetry (combined and standalone) and TRT • Designing for possibility to ~ 1 GeV • When? • Scheduled for 2002 shutdown • Started a preliminary technical evaluation by SL • Not yet certain to happen: Lack of enthusiasm. • Better definition of the optics and of the beam characteristics (Spring-Summer 2002). Preliminary design -> BIG BEAM SPOT. • First Runs for Tilecal, TRT and Muons could be in 2003

  13. Possibility of a wedge barrel run • Probably the last test beam period before the LHC run (2006 run may be very short) • It gives the chance for studying many aspects of the barrel calorimetry before ATLAS • ~Real Combined Response • Real-scale Modules • Triggering, readout and DAQ à la ATLAS • The common DAQ is almost there already: DAQ-1 • Tile and Muons already use it • TRT and Muons would be happy to run at the same time • SCT and Pixel are also potentially interested This program costs money and effort. People are busy and not really enthusiastic

  14. Combined barrel calorimetry Module 0 Barrel Module 0 1 or 2 Barrel Modules 2 or 0 extBarrel Modules

  15. Unsettled Issues • Do we run a combined run in ‘04? • DAQ Guru = ? • Oleg has been the best. Ever. • RODs • Valencia appears not suited to electronic design and construction. • Finger Power Supplies • Switching noise, rad hard, controls, ... • Georges started. No money. Ivan not Tile dedicated. • People • Participation is dwindling as in all experiments. • Analyzers dwindling. Same handful of people. New Results DB needs upkeep.