Project Plan Review

Project Plan Review. AAE 451: Team 2. Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis. Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm. Aerodynamics Jeff Haddin James Kobyra Kathleen Mondino Propulsion John McKinnis Andrew Rodenbeck.

nariko
Download Presentation

Project Plan Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Plan Review AAE 451: Team 2 Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm

  2. Aerodynamics Jeff Haddin James Kobyra Kathleen Mondino Propulsion John McKinnis Andrew Rodenbeck Structures Michael Caldwell Jason Tang Joe Taylor Dynamics & Controls Asif Hossain Tyler Wilhelm Task Assignments Leader: Tyler Wilhelm Co-Leader: Kathleen Mondino CFO: John McKinnis

  3. Scheduler

  4. Group Meetings • Regular Team Meetings • Mon. 6-9 PM • Wed. 6-9 PM • Sat. 9-? AM (When Necessary) • Subgroup Meetings • Scheduled on own time outside of regular team meetings • Meeting Locations • Reserved Classroom in Grissom • Meredith Hall Conference Rooms

  5. Group Meetings • Work one design review ahead • Presentations • Must be prepared before the Regular Team Meetings the night before the presentation is due • Will be reviewed by all team members at Regular Team Meetings • Run through at Regular Team Meetings

  6. Website http://aae451.jktang.com

  7. Team Milestones • Thiokol Final Design Report Draft • Thu. March 3 – Subgroups submit parts • Sat. March 5 – Assemble • Mon. March 7 – 1st Draft • Wed. March 9 – Final Draft • Week of Mon. March 7 – Freeze Design • Mon. March 7 – Submit Parts Acquisition List

  8. Team Milestones • Sun. March 19 – Build & Test Plan • Testing (March 24 – April 14) • Glide Test • Drop Test • Robustness Testing • Thur. March 24 – Ready to Mill • Thiokol Final Design Report • Sat. April 23 – 1st Draft • Mon. April 25 – Final Draft • Summary Project Presentation • Mon. April 25 – 1st Draft • Wed. April 27 – Final Draft & Run Through

  9. Calendar

  10. Calendar

  11. Calendar