70 likes | 188 Views
News and Miscellaneous UPO Jan. 11 2013 Didier Contardo , Jeff Spalding. Workshop on Upgrade simulations in 2013 (Jan. 17/18) ESP in 2013. Towards phase 2 TP: preparatory work in 2013. Prepare internal document on CMS phase 2 concept focus for June 2013 Upgrade week @ DESY
E N D
UPO Jan. 11 2013 News and MiscellaneousUPO Jan. 11 2013Didier Contardo, Jeff Spalding • Workshop on Upgrade simulations in 2013 (Jan. 17/18) • ESP in 2013
UPO Jan. 11 2013 Towards phase 2 TP: preparatory work in 2013 • Prepare internal document on CMS phase 2 concept • focus for June 2013 Upgrade week @ DESY • Longevity and long term performance of current detectors • Physics goals, and detector requirements In conjunction with ESPG and Snowmass • Detector concepts and preliminary performance studies • Targeted R&D program • Cost scale for Phase 2 • CMS discusses the document ~summer 2013 (ahead of ECFA workshop in Sep.) • Define phase 2 scope by end 2013 • Write Technical Proposal supported by detector performance and physics • simulations ( in Physics TDR?) in 2014 Slide from CMS Week How to Proceed? First steps: • Interim reports from the two WGs – due this month • Stand-alone documents which will become appendices of a covering note on Phase 1 detector longevity – due February • Electronics and systems (Magnus to lead a group) • Tracker (a simple note now on longevity vs temp to be updated by end of LS1) • HCAL (summary of what’s known and plans) • ECAL (summary of studies to date and projection) • Muon (based on (work for the) the Strategy Document)
UPO Jan. 11 2013 Proposal for Jan. 17/18 workshop • Goals of the workshop • Prepare an overall plan for upgrade simulation studies in 2013 • to address • Longevity and long term performance of current detectors • Physics goals, and detector requirements In conjunction with ESPG and Snowmass • Detector concepts and preliminary performance studies • Define the requirements and performance studies needed : • For detector optimization • For physics studies • Define the software developments needed • Geometries • Local Reconstruction • Object reconstruction • Define the samples needed (from central production) • Coordinate the release software developments and MC productions • Establish timeline for the software developments and performance studies • Define priorities
UPO Jan. 11 2013 Proposal for Jan. 17/18 workshop • Goal of the workshop: Develop plan for upgrade simulation studies in 2013 • (Note key dates in 2013: Upgrade Week DESY June 3, ECFA/Atlas/CMS Workshop September 4 (TBC)) • Studies with Phase 1 detector operating at phase 2 pile-up, including detector agingEstablish reference for comparison with phase 2 detector - assess performance limitations (especially for non upgraded detectors) - tune high pile-up object reconstruction and physics analyses… • What is missing to produce MC samples • Studies with Phase 1 detector and "extended performance module(s)" • To establish detector/trigger requirements (or priorities) and physics performance (parametric endcap/forward calorimetry, improved muon(?), timing in the forward region, and tracking beyond current eta range, trigger requirements…) • What are the specific goals and the software development efforts involved • Studies by May to be reported and summarized in June Upgrade Week, with the goal of • including performance criteria for Phase 2 in the summer document for CMS • Studies with Phase 2 detector and new trigger concept • Establish detector and physics performance at HL-LHC • Plana common release with first implementation of new detector concept and trigger for first full/fast simulation studies – present progress in June Upgrade Week. • Results for September ECFA workshop
UPO Jan. 11 2013 Proposal for Jan. 17/18 workshop agenda • Thursday 17 • Session 1: Opening (9:00 - 12:00) conveners Didier/Jeff • Introduction (UC/PC) • Upgrade goals and schedule for 2013 • HL-LHC beam conditions • Assumptions for luminosity (peak, leveled, integrated), beam spot and pile-up density • Goals and schedule for physics studies in 2013 • Overview of detector concepts and context for upgrade simulation studies • Release and Production plan (Offline/PPD/Computing/Simulation) • Status of current release(s) (phase 1 detectors) • Issues for high pile-up simulations and MC production - fullsimvsfastsim... • Proposal for new release(s) and schedule • Release validation • Session 2: Projects and Working Groups simulation plans for 2013 (14:00 – 18:00) conveners Lucia/Liz • Address the plans for the three areas of simulation studies mentioned in previous slide, focusing on the relevant one(s) for each project and wg • ECAL - HCAL - Muons - Tracker - Forward Detector - Trigger • Status and plans (schedule/steps) for CMSSW software developments of phase 2 detector and trigger implementation in full/fast simulation (covering: detector aging, new geometry, local reconstruction, trigger primitives, L1 trigger and HLT emulation...) • Performance studies and specific MC samples associated(full/fast sim, digi/reco...) • Need for fluence/irradiation simulations • ...
UPO Jan. 11 2013 Proposal for Jan. 17/18 workshop agenda • Friday 18 • Session 3: Data reconstruction (9:00 – 10:45) conveners Patrizia/Luca • Addressing status and plans for physics object reconstruction at high pile-up with phase 1 and phase 2 detectors, specific MC sample need. • Implementation of HCAL depth segmentation in reconstruction (HCAL) • Development of track reconstruction at high pile-up for phase 1 and phase 2 detectors (TK POG) • Development of GED at high pile-up for phase 1 and phase 2 detectors (tbd) • Session 4: Physics plans (11:15 – 13:00) convener Chris • Addressing goals, status and plans to develop software tools and MC physics benchmark samples needed (specific or common) in three main areas : • Studies with Phase 1 detector operating at phase 2 pile-up, including detector aging • Studies with Phase 1 detector with "expended performance module" • Study with Phase 2 detector and new trigger concept • Session 5: Closing session (14:00 – 16:00) conveners Didier/Jeff • Wrap-up of workshop and general discussion on next steps
UPO 2/2/12 ESP – discussion – plan to converge for 2013 WG conveners, Elec/Online coordinators, R&D coordinator, each responsible for estimating need and approving pledges