An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIFI Critical Design Review ICU Programmatics, Resources and Implementation Readiness Renato Orfei IFSI-CNR

  2. ICU Programmatics • The main programmatic problem is the funds availability at the “right” moment at IFSI. • ASI in under deep re-organization and probably the contract ASI/CNR (to transfer funds from ASI to CNR) instead of being approved every year will be done only once for the whole programme length (with evident beneficial effects). • The contract ASI/CGS is managed independently from the contract ASI/CNR and there should not be problems.

  3. ICU Resources • The temporary problem for the SW development is over, the help of AUDIONICA was necessary but we are sure that we can go on progressing with our own specialists: • A.M. Di Giorgio • Riccardo Cerulli • Sergio Molinari (CDMS topics) • Giovanni Liu’ (CDMS topics) • CGS help for the PROM SW is available • The HIFI provided S/Ss simulator is performing well and we are confident that we can keep it here at IFSI for the ongoing debugging/development of the AVM, EQM and FM.

  4. Implementation • The AVM HW with a preliminary SW was delivered on the 13th of November. • For the EQM manufacturing (namely DC/DC converter) we are still waiting ASI to issue the Project Directive #4: the updating of the power provided to the FCU is the main change between the AVM and the EQM-FM. • The delay for the issuing of the PD #4 is again due to the ASI re-organization. • Once solved the procedure started with the PD # 4 we do not see further problems for the implementation of the EQM-FM.