300 likes | 440 Views
NADP P rogram Office Report. 2013 Spring Meeting, Madison WI Joint Subcommittee D. Gay. Network & Site News. New with NTN. Since April, 2012 Lost 3 Gained 11+1 next week Total 265 NTN Sites +2 co-located. NY State Network Inclusion In NADP with NYSERDA and NY DEC.
E N D
NADP Program Office Report 2013 Spring Meeting, Madison WI Joint Subcommittee D. Gay
New with NTN Since April, 2012 Lost 3 Gained 11+1 next week Total 265 NTN Sites +2 co-located
NY State Network Inclusion In NADP with NYSERDA and NY DEC NY22 New NTN NY98 New NTN @MDN NY20 NY29 NY52 New MDN Litterfall NADP NY08 NY67 NY10 NY01 NY68 NY99 NY96
NTN: Argentina (AG01) Update Running pretty well…. “Bag Sampler” Long dry spell
New Analyte For NTNBromide in Precipitation Will be in the database soon for 2012 2012 Maps Fall 2011 NAPD Joint Sub-Committee Report, Slide ‹#›
New with NTN Good morning— I am pleased to announce that the CAL received its 370,000th sample from the National Trends Network this morning! The sample was collected on January 22nd by Matthew Borden at PA18 (Young Woman’s Creek). All the best, Chris
New With AIRMoN VT99 may expire on May 7th, 2013
New With AMoN? Since April, 2012 Lost 0 Gained 6 Total 61 Sites
New With AMoN? • Current Price • $100/ two week period • $3100 per year • No closures • Perhaps more sites on the horizon?
New With MDN oth Since April 20123 lost 1 added 109 currently 2 maybes (107) 17 methyl 54 collocated 7 urban 4 daily
New With AMNet oth Since April 20123 lost 3 added 18 currently
New With AMNet oth • Valid observations, after all QA • GOM = 198,692 • PBM = 189,796 • GEM (Averages) = 211,723 • New data release policy (in NOS) • SOPs complete and up for approval (in NOS)
AMNet: Dry Deposition of Hg? • Proposal for Collaboration between Environment Canada and NADP • Discussion of method in TDEP • Goal: to estimate the dry deposition at all AMNet sites of • Gaseous Elemental Mercury (GEM, bi-directional) • Gaseous Oxidized Mercury (GOM), and • Particulate Bound Mercury < 2.5 micron (PBM2.5)
Litterfall Initiative • Start date Aug 1 (early fall) • 14 sites • SOPs in place
Movie Night! • 1983 “To Catch a Cloud” • Edison Electric Institute • Playing on the table outside.
Special Technical Session Meeting • Wed night, 6-10pm • Mark’s house • Maps on the table
Publications • 170 for 2012! • All years (to 2008) on web.
Tough Site Conditions Slide Series Long Island Sound Belfort update
Tough Site Conditions Slide Series Collecting Snow Is Very Difficult, as we all know…. Raingage amounts from Bondville for the snow event on 3/24-3/25: IL11 NWS Stick 0.18” (No shield) IL11 Pluvio 0.13” (No shield) IL11 Pluvio 2 0.20” (No shield) CRN Geonor 0.89” (with double Alter-type shield) CRN Backup 0.03” (inside double Alter-type shield) WARM Pluvio 2 – 0.22” (No shield) WARM Pluvio 2 at ISWS 0.77” (No shield) AIRMoN Sample Volume 0.01”
Runner Up “Molecule of the Year”
Current Electronic Raingage Network (All Networks) ~250 out of 300 Locations
New Pumps • Spent $1000 on 200 pumps for the two networks, to sifon off the water out of the electronic gages. This will make removal of the bucket not necessary. Sometimes they put the bucket back in wrong and miss data. Seemed like a small price to pay. All wet networks • Harbor freight • http://www.harborfreight.com/multi-use-transfer-pump-66418.html
Training Sessions • A decision to go to Video-based Webinars • Training and news • Interaction between sites • Began Jan, 2013, • Monthly Webinars • Training • Updates • Etc. • HAL and CAL will alternate Spring 2010 NAPD Joint Subcommittee Report, Slide 25
Data Completion • Currently for NTN, MDN, & AIRMoN • Through November 2012 • All data and maps on schedule (June/July)
Data Completion • AMoN • Through December 2012 on the web. • Serve data in the same fashion • Map, site info (present), data selection as with other networks • 4250 observations • 4128 valid (97.1%)
Data Completion • AMNet • Data review completed for most sites through Jan 2013 • password protection still present • New distribution conditions (in NOS) • 600,211 valid observations (GEM+GOM+PBM)
Web Presentation of Meeting • First Try Here! • (so be on your best behavior) • Both Joint sessions • Both NOS sessions • Same room • Total Deposition Spring 2010 NAPD Executive Committee Report, Slide 29
NADP Program Office Report 2013 Spring Meeting, Madison WI Joint Subcommittee D. Gay