An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scottish Renewables Annual Conference March 2013 : Showcase Presentation, Neil Lochiel

  2. Inverclyde’s ready for you……………… • Inverclyde Renewables Alliance Group : current membership • Riverside Inverclyde • Scottish Enterprise • Inverclyde Council • Clydeport • 2020 Renewables • Mainstream Renewable Power • Jenda Energy • Ferguson Shipbuilders • James Watt College • JLES • Sanmina-SCI • Serco Marine Services • Sangamo • (Subocean Group) • Recent guest speakers : Paddy O’Kane, Alan Mortimer, Terry Hogg, John Robertson • Guests have included : Duncan McNeil MSP, Stuart McMillan MSP, David Cairns MP, Iain McKenzie MP, Sandy Cumming

  3. Ports, Infrastructure and Connectivity

  4. From Inchgreen to Ocean Terminal

  5. Inchgreen Key Features • 203,000 square metres • Dry dock 304.8m x 47.5m • Quayside 420m • Hard standing area 60m x 95m • Re-inforced module mat 100m x 80m • Min/max water depth at low tide 8.2m (low tide)/11.3m (high tide) • 15-70 tonnecranage • “Extended Inchgreen” potential (of up to 367,000 square metres)

  6. “Extended Inchgreen” to include JWD

  7. Ports, Infrastructure and Connectivity

  8. 3 Key Sites • Kelburn, Port Glasgow • Ideal for light industrial use with great connectivity • 6.45 acre development site • ri has invested in major site infrastructure (including new access road and site platforming works) • Phase 1 of speculative building construction will provide a total of 40,000 square feet on 3.63 acres • Additional 2.82 acres of serviced development land is also available for bespoke design and build opportunities • Phase 1 construction 2013

  9. Ports, Infrastructure and Connectivity

  10. 3 Key Sites 2. Cartsburn, Greenock • Ideal for regional offices or HQ (on A8 dual carriageway) • 3.7 acre development site • ri has invested in major site infrastructure (including a new dedicated site entrance, drainage connections and remediation) • Site can accommodate up to 70,000 square feet of office development, including extensive dedicated car parking • Customised design/build ownership or lease options available • Availability 18-24 months from commitment

  11. Ports, Infrastructure and Connectivity

  12. 3 Key Sites 3. Custom House, Greenock • Ideal for a multi-occupancy office space in a central heritage location • Refurbishment works underway • Waterfront location opposite Greenock Central railway station with its 3 trains per hour to Glasgow • Variety of different sized rooms • Ideal for companies looking for a presence in Scotland, handy for ITREZ and Glasgow Airport, and with very competitive rates compared to Glasgow city centre • Customised design/build ownership or lease options available

  13. Inverclyde • Ports, Infrastructure and connectivity • Strong engineering, shipbuilding, manufacturing and IT heritage • Skilled workforce • Mass manufacturing capabilities • Port with dry dock and deep water, ready to operate • Can accommodate small office requirement through to high value, high volume jobs locations • An ambitious Urban Regeneration Company with strong local partnerships and a track record of successful delivery • RSA Grants potential of 15%, 25% and 35%, business size dependent