20 likes | 219 Views
PFP Instrument Status. All PFP Instruments Except SWEA have been delivered, integrated, and tested including: IPTO Functional Self Test Transition SVT Science SVT Issues being worked: EUV alignment shims not flat. SEP temperature sensor noise Working to relocate temperature sensor
E N D
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested including: IPTO Functional Self Test Transition SVT Science SVT Issues being worked: EUV alignment shims not flat. SEP temperature sensor noise Working to relocate temperature sensor MAG temperature monitor offset Missing Time Update Counter Considering flight software fix SASM/LPW timing offset Unexpected phase difference measured Have not yet identified source; looking on spacecraft and instrument side
SWEA Status SWEA has had high voltage discharges during thermal vacuum test, one of which damaged a preamp Thermal Vacuum diagnostics completed SWEA team is working with FRB to chart a path forward Repair the damage Inspect and bench test electronics for further diagnosis Determine how best to protect the system from future damage Reassemble, retest, requalify Deliver to spacecraft and integrate