150 likes | 257 Views
FIELDS Instrument Risks Status. 5. 4. PSM. F8. 3. PS. F9. Likelihood of Occurrence (probability). 2. P. P. P. P. P. F6. F1. F2. F5. F7. CS. P. P. CS. CS. F3. F13. F10. F12. F11. 1. 1. 2. 3. 4. 5. Consequence of Occurrence (Impact).
E N D
FIELDS Instrument Risks Status 5 4 PSM F8 3 PS F9 Likelihood of Occurrence (probability) 2 P P P P P F6 F1 F2 F5 F7 CS P P CS CS F3 F13 F10 F12 F11 1 1 2 3 4 5 Consequence of Occurrence (Impact) Mitigation Plans in Place for All FIELDS Risks
FIELDS Phase B Risks Mitigation • FIELDS Risk Mitigation activities for Phase B include: • Antenna Qualification: • Nb materials testing, optical props aging (~Feb to Apr ‘12 TBR(was 3/12), MSFC or EMTL(was Odeillo, France)) • Antenna model thermal testing (~Oct ‘12 to Jan ‘13 (was 3/13), Odeillo, France) • Additional contingency test, if needed (~Oct ‘13, Odeillo, France) • SCM / MAG / FGM Trade: • Determine the optimal technical (dynamic range) & resource (mass and thermal) solution (close by 4/12) • See Trades Slide for additional information. • MAG Performance Over Temperature: • MAG Cold Operations Test (~1/13) • MAG Thermal Cycling Test (end of Phase B) • MAG/SCM Interference: • MAG/SCM Interference test (similar to the MAG/FGM test performed in 7/11) (~5/12 TBR (was 4/13), Chambon, France) • Blue = change since MDR
F1-P:Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F2-P: Risk Burn Down 25 20 Risk Grade 15 10 5 A Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F3-CS: Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C D E Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F5-P: Risk Burn Down 25 20 Risk Grade 15 C 10 5 AB D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F6-P: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F7-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F8-PSM: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F9-FS: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F10-PS: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F11-S: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F12-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F13-P: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion