170 likes | 246 Views
FIELDS Instrument Risks Status. 5. 4. 3. PS. F9. Likelihood of Occurrence (probability). 2. P. P. P. P. P. F5. F6. F1. F2. F7. S. CS. P. P. CS. CS. F13. F12. F11. F3. F10. F14. 1. 1. 2. 3. 4. 5. Consequence of Occurrence (Impact). High. Medium. Low.
E N D
FIELDS Instrument Risks Status 5 4 3 PS F9 Likelihood of Occurrence (probability) 2 P P P P P F5 F6 F1 F2 F7 S CS P P CS CS F13 F12 F11 F3 F10 F14 1 1 2 3 4 5 Consequence of Occurrence (Impact) High Medium Low (Criticality) Mitigation Plans in Place for All FIELDS Risks
Risk Notes: June 2012 • 1) F13 - Phase B Schedule Risk (chart 17):- impact & status need to be reassessed; pending ongoing review/discussions re. the recently received Phase B contract • 2) F3 - Foreign Funding (commitment) (chart 7): - On 5/8 the FIELDS team learned that due to the heavy workload on the RPW/TNR-HFR team and the currently tight schedule fr the RPW/Solar Orbiter, LESIA cannot commit as initially planned for a full development and building of the FIELDS TNR/HFR. • - At that time, the likelihood for risk F3 was increased from a 1 to a 4 • Alternative to TNR/HFR presented on 6/12 and further information received on 7/2. Evaluation of options for how to proceed is ongoing. • - UCB will implement budget/schedule for replacement option by 9/12, bringing risk F3 back to green • Will then open a new technical risk to track the development of the new TNR/HFR option • 3) F8 – Magnetic Sensor/SCM Dynamic Range (chart 11): - Risk Retired. Decision made to sample the MAG faster to cover the gap in frequency
FIELDS Phase B Risks Mitigation • FIELDS Risk Mitigation activities for Phase B include: • Antenna Qualification: • Nb materials testing, optical props aging (~Feb to Apr ‘12 TBR(was 3/12), MSFC or EMTL(was Odeillo, France)) • Antenna model thermal testing (~Oct ‘12 to Jan ‘13 (was 3/13), Odeillo, France) • Additional contingency test, if needed (~Oct ‘13, Odeillo, France) • SCM / MAG / FGM Trade: • Determine the optimal technical (dynamic range) & resource (mass and thermal) solution (close by 4/12) • See Trades Slide for additional information. • MAG Performance Over Temperature: • MAG Cold Operations Test (~1/13) • MAG Thermal Cycling Test (end of Phase B) • MAG/SCM Interference: • MAG/SCM Interference test (similar to the MAG/FGM test performed in 7/11) (~5/12 TBR (was 4/13), Chambon, France) • Blue = change since MDR
F1-P:Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F2-P: Risk Burn Down 25 20 Risk Grade 15 10 5 A Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F3-CS: Risk Burn Down A 20 15 Risk Grade 10 B 5 Plan Actual C D E * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F5-P: Risk Burn Down 25 20 Risk Grade 15 C 10 5 AB D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F6-P: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F7-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F8-PSM: Risk Burn Down Risk Retired A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F9-FS: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F10-PS: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F11-S: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F12-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F13-P: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F14-S: Phase B Contract A B 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion