An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Reconnaissance and Autonomous Targeting System (JRATS) Master Schedule PROD To Complete FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 Milestones & Phases Production & Deployment LRIP effort FRP/ Operations & Support TD phase Engineering and Manuf Dev Increment 1 FRP DR IOC Post-CDR Assessment C B Final RFP Release Post MS-B R&D RFP Contract Award Lot 6 TD phase K post-MS B R&D Contract Production Contract Lot 1 Lot 2 Lot 4 Lot 5 Lot 3 Technical Reviews PDR PRR Note: Exact dates for key events on this schedule are provided on the next sheet Prototype Testing Dev Testing EDMs DT ECPs DT/Interop Demos JITC Interop Cert Operational Testing OTRR IOT&E FOT&E EOA OA BLRIP Deliveries 1 2 1 1 Lots 1 & 2 (LRIP) Full Rate (Lots 3-6) EDMs Increment 2 (Bio-Chem sensor system) IOC Nov 26 Technology Development phase / Engineering and Manufacturing Development phase B Version 3.2, updated by gh, 12-31-08

  2. Post-MS B R&D RFP Release May 2016 Preliminary Design Review August 2016 Milestone B Nov 2016 Post-MS B R&D Contract Award Nov 2016 Post-CDR Assessment March 2017 EDM Deliveries May 17 - Jan 18 MS C Operational Assessment Oct 18 - Feb 19 Production Contract RFP Release Jan 2019 Milestone C Apr 2019 Production Contract Award May 2019 Lot 1 Prod Deliveries Begin (LRIP) May 2020 JITC Interop Certification Testing July 2020 MS B Increment 2 (Bio-Chem) July 2020 Delivery of Eight Lot 1 systems complete* Sept 2020 IOT&E Begins Nov 2020 IOT&E Ends Jan 2021 BLRIP/ FRP Decision Review March 2021 IOC (Increment 1) November 2021 IOC (Increment 2) November 2026 * Remainder of Lot 1 will be delivered in FY 21. Dates refer to Increment 1 unless other noted.