Mason School District. Building Work Committee Renovation & Expansion Project Presentation March 7, 2009. THE TEAM. Mason School District Building Committee Mary McDonald Bob Bergeron Fred Greenwood Bob Hemmer Bernie O’Grady The Jordon Institute Energy Consultants Paul Levelle
E N D
Mason School District Building Work Committee Renovation & Expansion Project Presentation March 7, 2009
Mason School DistrictBuilding Committee Mary McDonald Bob Bergeron Fred Greenwood Bob Hemmer Bernie O’Grady The Jordon InstituteEnergy Consultants Paul Levelle Kirk Stone Daniel V Scully Architects Daniel Scully Katie Cassidy Sutherland The Jordon InstituteConstruction Managers John Gaston David Bryson Other Key Contributors Mark Richardson George & Catherine Schwenk, The Mason Congregational Church NH DOE & lots of on-lookers! …
To Provide Information • How We Got Here : Needs Assessment & Design Themes • What it looks like : Building Plans Overview • Estimated Cost • Schedule • To Answer Questions • Your thoughts, questions, ideas & overall Feedback • Prepare for March 12th Vote
How We Got Here • Withdrawal from Mascenic School District • Creation of Mason School District • Create Curriculum • Build a Staff • Find a "Home" for students • What We Considered • Building a New School for K thru 12 • Build a New Building for K thru 5 • Utilize Existing Buildings for K thru 5 • Add on to Existing Building for K thru 5
Proposed : Site Modification Town Hall Existing School Parsonage Old Road School Lot Line Adjustment Relocation of Parsonage Lot
REQUIRED Life & SafetyADA AccessFire EgressNH Dept. of EducationStructural Repair Fire Detection UpgradeBuilding Code Upgrade
REQUIRED 5th GradePossible Due to Expansion of ExistingSpace to Required Minimum
REQUIRED Administration SpaceREQUIRED CafeteriaPrincipalSuperintendentStaff RoofConference RoomCafeteriaKitchen
Computer /ArtExpansionUtilized forComputer / MediaRoom and Art RoomIf Population Bubble OccursIt Can Be Utilized As A Larger Grade Classroom
School / TownShared SpaceExpanded Space Can Be UtilizedFor School Music SpaceShared With The Town It CanBe Utilized AS A Meeting Space, Function Hall, Etc.
Schedule Outline Mason School District Bond Appropriation March 12, 2009 Lot line & Site finalization - Parsonage relocated June 2009 Ground Breaks for Addition July 2009 School Starts – Classrooms & Mechanical Room Complete Admin & SPED in Temps August 2009 Addition Complete June 2010 Renovation of Administration & Building Connection August 2010 Temporary Classrooms removed August 2010 Building Project Completed September 2010 High Performance Certification December 2010 / January 2011
Estimated Cost & Potential Aid Architectural / Engineering Design$ 577,109Site / Construction$3,886,425Total Bond Appropriation$4,274,534TOTAL DOES NOT DEDUCT NH AID (30%) TOTAL DOES NOT DEDCUCT GRANT PROPOSALS TOTAL DOES NOT DEDUCT ECONOMIC STIMULUS OPPORTUNITIES (Possibly as high as 5+%)
What Your Vote Will Do • YES • Will have the project proceed as presented. • (The action that the Building Committee Endorses) • NO • Will stop all present projects. • Require us to resubmit a plan to the NH Dept. of Ed. • If plan does not meet their approval, they take over the process. • Possible closing of school and require us to tuition K thru 5. • Loss of NH State funding possible. • Loss of Federal Funding. • Present debt due to Mascenic due in full this year. • Tax impact will be significantly higher. • Cost of sending our children to school may be significantly higher. • (This action is NOT endorsed by the Building Committee)