Alkek Surgical and Imaging Expansion. Pre-Submittal Conference March 13, 2009. Team Members. Jim Waters, Project Director, Shell and Core Janet Sisolak, Project Director, Interior Build-out Pam Redden, Project Director, Clinical Operations Dan Butterwick, Chief Architect
E N D
Alkek Surgical and Imaging Expansion Pre-Submittal Conference March 13, 2009
Team Members • Jim Waters, Project Director, Shell and Core • Janet Sisolak, Project Director, Interior Build-out • Pam Redden, Project Director, Clinical Operations • Dan Butterwick, Chief Architect • Greg Hudgins, Project Manager
Project Objectives • Enhance the front door of M.D. Anderson Cancer Center • Add horizontal expansion space to levels 3 and 5 to support Diagnostic Imaging and Perioperative Enterprise, respectively. • Ultimately, free up space on the Alkek floor plate to provide more operating rooms and diagnostic imaging suites
Project Objectives (continued) • Look for opportunities to further maximize number of operating rooms (level 7) • Resolve expansion needs of sterile processing and perioperative clean supply (basement)
Project Goals • Minimize closure of the front door • Provide future planning flexibility • Long term strategy for Lutheran Pavilion replacement • Programmatic changes
Existing Alkek Basement New Basement 15,000 SF Basement Level Expansion Block Plan
Level 1& 2 Covered Drop off Level 1 Expansion Block Plan
Level 3 Existing Alkek D.I. Level 3 New D.I. 15,000 SF Level 3 Diagnostic Imaging Expansion Block Plan
Existing Alkek DI Interstitial Level 4 New D.I. Interstitial 15,000 SF Level 4 Interstitial Expansion Block Plan
Level 5 Existing Alkek POE Level 5 New P.O.E. 15,000 SF Level 5 Perioperative Enterprise Expansion Block Plan
Existing Alkek POE Interstitial Level 6 New P.O.E. Interstitial 15,000 SF Level 6 Interstitial Expansion Block Plan
Level 7 Existing Alkek I.C.U. Level 7 New P.O.E. 15,000 SF Level 7 Perioperative Enterprise Expansion Block Plan
Existing Alkek Mechanical Level 8 New P.O.E. Interstitial/ Mechanical 15,000 SF Level 8 POE Interstitial/ Mechanical Expansion Block Plan
Impacts Evaluated Construction Impacts Design Impacts Operational Impacts Downstream Impacts
Construction Impacts Site Logistics/Staging Construction Access Construction Supply - Bates and Bertner Crane Placement & Removal Vibration/Noise Infection Control - dust Safety-dropped loads
Design Impacts Optimizing the site and creating the right front door image Confirm both the interior and exterior aesthetic design objectives Confirm impact to both budget and schedule to optimizing the site MEP Issues Confirm whether capacity in main building will support the addition. Structural Issues Rotunda bridges can stand alone, to allow Rotunda to be removed Basement is feasible, but may be cost-prohibitive
Operational Impacts Keeping the Rotunda drive closed for extended duration Further closure of Rotunda to pedestrian traffic Visitors - Garage 2 Valet Operations – currently operating out of Clark Clinic Discharges – Currently using Emergency Center PT/OT – Continued closure of gardens used for gait training and pet therapy Flooding Exposure