130 likes | 263 Views
Why – liberalised power market Project objectives How to do Status of project. Project objektive and status. Jenbacher, Pon Power, Rolls Royce, and Wärtsilä NERI (national environmental research institute) DGC Finance from PSO (power and gas companies). Project participants. 1000 MW DC.
E N D
Why – liberalised power market Project objectives How to do Status of project Project objektive and status
Jenbacher, Pon Power, Rolls Royce, and Wärtsilä NERI (national environmental research institute) DGC Finance from PSO (power and gas companies) Project participants
1000 MW DC 720 MW DC 1700/1300 MW AC Sverige 60 kV 1200/800 MW AC 600 MW DC
MW 4000 3000 Elforbrug 1.200 – 3.650 MW 2000 CENTRAL CENTRAL 1000 VIND DKV VIND DKV 1994 2004 Værdier for Jylland/Fyn Production capacity
Make a plan • Tariff for other producers Central load planning kr/MWh MWh/h Price offer to spot market Spot price each h Spot market
Decentral kraftvarme og vind Priority to CHP and wind produktion integreret i elmarkedet Pris Pris Central CHP Central Wind CHP and wind Central plants Price offer Price offer Demand – high load Demand – high load Demand – low load Demand – low load P High P P high Low P low MWh MWh
Wind production is not well predicted Power system manager need reserves Central and de-central plants can participate in regulation market Need short response times Liberalised power market
As short as possible response time to participate in the power regulation market Watch for safety, operability and durability First objective
Have less emission of CO, NOx and UHC during start and stop Provide better knowledge on the engine start stop emissions Second objective
Measuring program for better knowledge on start stop emissions Change engine system for shorter response times Document new emissions Report shorter response times and lower emissions How do we proceed
Rolls Royce (only one type) Caterpillar 3500 series Jenbacher 300 series Wärtsilä 34 series Engines for development