An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. West Valley Demonstration ProjectStatus Update Scott Anderson Deputy General Manager January 30, 2018

  2. Agenda • Who We Are • Site Background • Agency Responsibilities • Project Scope • Current Status • Accomplishments/Look Ahead • Issues/Challenges

  3. Who we are TheCHBWV team is comprised of CH2M HILL, BWX Technologies, Inc. and Environmental Chemical Corporation (ECC). The project is conducted by the U.S. Department of Energy (DOE) in cooperation with the New York State Energy Research and Development Authority (NYSERDA). The West Valley Demonstration Project is an environmental cleanup and waste management project located about 35 miles south of Buffalo. • CHBWV Team – 312 Employees and Subcontractors • 123 - Salaried • 90 - International Association of Machinists and Aerospace Workers, Lodge 2401 • 96 - Subcontractors ($224M is subcontracted, of that 55% is awarded to Small Business)

  4. Background 1966-1972 – Spent fuel reprocessing resulted in 600,000 gallons of liquid high-level waste. Plant shut down for modifications; operations never resumed. 1980 – President Jimmy Carter signs the West Valley Demonstration Project Act. 1962 – Nuclear Fuels Services constructed the first commercial nuclear fuel reprocessing plant in the United States at West Valley. 1996-2002 – HLW vitrification is conducted at the WVDP, resulting in 275 canisters of vitrified HLW. 2011 – CH2M HILL BWXT West Valley was awarded WVDP Phase I Decommissioning Facility Disposition Contract for WVDP

  5. Agency Responsibilities • New York State Energy Research Development Authority (NYSERDA) owns the WVDP premises and the surrounding 3,345 acres • Western New York Nuclear Service Center (WNYNSC) • Includes the State-Licensed Disposal Area (SDA) and the Nuclear Regulatory Commission-Licensed Disposal Area (NDA) • DOE manages 200 acre portion of WNYNSC under the WVDP Act • Solidify High Level Waste (HLW) • Develop containers for disposal of HLW • Transport HLW to federal repository for disposal • Dispose low-level waste and transuranic waste resulting from HLW solidification program • Facility decontamination and decommissioning • U.S. Nuclear Regulatory Commission (NRC) prescribed WVDP decommissioning criteria • Consistent with decommissioning criteria under NRC’s license that is held in abeyance by NYSERDA

  6. CHBWV Contract Scope Milestone 1 Complete relocation of 275 HLW canisters and 3 non-conforming HLW canisters to long-term interim storage Milestone 2 Process, Ship, and Dispose of all Legacy Waste with Pathway for Disposal Milestone 3 Demolition and Removal of Main Process Plant Building and the Vitrification Facility Milestone 4 Complete All Work in Performance Work Statement, including Balance of Site Facilities, Surveillance and Maintenance, and Site Operations

  7. Contract Milestone Status MS-1 – Relocating Last HLW Cask MS-4 – Balance of Site MS-3 – Facility Demolition MS-2 – Legacy Waste Disposition

  8. Accomplishments and Look Ahead • Milestone 1 – Relocate High Level Waste • Accomplishments • 56 of 56 casks complete (100%) • 392 days early! • Equipment to be reused at Hanford (CHPRC) • Milestone 2 – Legacy Waste Disposition • Accomplishments • 143,626 ft3 of 165,515 ft3 legacy low level waste disposal complete (86%) • 241 of 241 non-HLW drums relocated (100%) • Resumed repackaging contact handled legacy waste in the Container Sorting and Packaging Facility and the Waste Processing Area and remote handled waste in the Remote Handled Waste Facility • Look Ahead • Continue processing and shipment of legacy waste HLW Storage Pad Legacy Waste Processing

  9. Accomplishments and Look Ahead (cont.) • Milestone 3 – Demolition and Removal of Main Plant Process Building and Vitrification Facility • Accomplishments • Main Plant deactivation – 80% complete • Vitrification Facility demolition began September 2017 – 47% complete • Look Ahead • Complete Vitrification Facility demolition – Spring 2018 • Complete MPPB deactivation • Begin MPPB demolition – September 2018 • Milestone 4 – Completion of Performance Work Statement(Balance of Site Facility Demolition) • Accomplishments • 19 of 47 site facilities demolished (40%) • Initiated infrastructure and utility system reroutes (electrical, gas, air, water, Information Technology) • Look Ahead • Continue infrastructure improvements and utility system reroutes to position site for future D&D • Forecast completion – March 2020 Demolition of Vitrification Cell New Communication Systems Hub

  10. EnergySolutions’ Role in West Valley Decommissioning • Transportation Assets • Logistics • Transload • Rail • Disposal Assets Intermodal at West Valley Ready for Shipment to Alaron Gondola at Alaron Ready for Shipment

  11. Issues/Challenges • Funding under Continuing Resolution • Open air demolition of highly contaminated Main Plant hot cells • Aging/failing infrastructure – rail, natural gas, electrical, surface water management features