West Wall Compressor Requirements. West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West Wall to meet <= 30m hose lengths Build necessary structure to support compressors & services Additional requirements Personnel access
E N D
West Wall Compressor Requirements • West Wall Mezzanine • Move compressors to the West Wall to distance from magnetic field • Find compressor position on West Wall to meet <= 30m hose lengths • Build necessary structure to support compressors & services • Additional requirements • Personnel access • Compressor access (for installation & swap) • Equipment delivery & assembly space (esp MICE Devices)
Compressor Line Routing Different Routing Layouts • Many routes tried
Compressor Locations (based on hose routing) 15 x Cryomech Compressors Step IV racks 4 x Sumitomo Compressors Step V & VI racks
Other Features Compressor on a scissor jack trolley Walkway over hose & cables Ramp to north mezzanine Stairs access to south mezzanine
Equipment Delivery & Assembly Area RFCC as delivered (laid down & no RF couplings) SS in lifting position with tandem lifting frame
Toilets will be removed for new ISIS switchgear (2014) MLCR & Rack Room #2 New access doors ISIS switchgear ISIS Plant room door move (position TBD) Existing locker room = Rack Room #2 Extended MLCR Cables routed under stairs with access via Rack Room #2 (volume to be fireproofed) Existing rack room = Rack Room #1 Cables routed under false floor then into Hall (not an insignificant task!) 2D Layout from John Webb