1 / 6

West Wall Compressor Requirements

West Wall Compressor Requirements. West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West Wall to meet <= 30m hose lengths Build necessary structure to support compressors & services Additional requirements Personnel access

pearly
Download Presentation

West Wall Compressor Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. West Wall Compressor Requirements • West Wall Mezzanine • Move compressors to the West Wall to distance from magnetic field • Find compressor position on West Wall to meet <= 30m hose lengths • Build necessary structure to support compressors & services • Additional requirements • Personnel access • Compressor access (for installation & swap) • Equipment delivery & assembly space (esp MICE Devices)

  2. Compressor Line Routing Different Routing Layouts • Many routes tried

  3. Compressor Locations (based on hose routing) 15 x Cryomech Compressors Step IV racks 4 x Sumitomo Compressors Step V & VI racks

  4. Other Features Compressor on a scissor jack trolley Walkway over hose & cables Ramp to north mezzanine Stairs access to south mezzanine

  5. Equipment Delivery & Assembly Area RFCC as delivered (laid down & no RF couplings) SS in lifting position with tandem lifting frame

  6. Toilets will be removed for new ISIS switchgear (2014) MLCR & Rack Room #2 New access doors ISIS switchgear ISIS Plant room door move (position TBD) Existing locker room = Rack Room #2 Extended MLCR Cables routed under stairs with access via Rack Room #2 (volume to be fireproofed) Existing rack room = Rack Room #1 Cables routed under false floor then into Hall (not an insignificant task!) 2D Layout from John Webb

More Related