An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EEO Trial Assessment at Tarong Power Station DRET Workshop June 2012 • Gabriele Sartori

  2. Overview • The new Stanwell Corporation Limited • Timeline for EEO compliance • Background of Trial assessment • EEO Assessment Framework • Preparing for assessment workshop • Information and data • Background paper • People mix • Undertaking the workshop • Results of workshop • Learnings from the workshop

  3. Stanwell Corporation Limited’s assets

  4. Timeline for EEO compliance – where are we now? • Baseline year to trigger EEO compliance - FY 2010/11 • Trial assessments at TPS and Torrens Island • Register with DRET by end of March 2012 • Trial assessment at Colongra gas peaker • DRET Workshop Brisbane • Submit an assessment plan by December 2012 • Finish the first assessment by June 2013 • First report to government and public December 2013 • The following years only annual public reports • At the end of 1st cycle 2nd government report

  5. Backgroundof trial @ TPS • Department’s decision • Intent of Trial Assessment • TPS’ long standing tradition in efficiency • Support from C-level for EEOA trial at TPS

  6. EEO Assessment Framework • Leadership • People • Information, data and analysis • Opportunity identification and evaluation • Decision making • Communicating outcomes

  7. Preparing for assessment workshop – Information, data and analysis • Collect information – previous assessments, energy audits and GES activities • Data collection • Systems and processes • Total energy use by type • Energy use by area and time of use • Analysis of trends • Whole of system performance indicators

  8. Preparing for assessment workshop –Background paper • Introduction to the EEO Act • Info about the corporation and the Power Station • Energy use and analysis • Industry best practise • Data gaps • Assumptions • Costing information • Opportunity areas

  9. Preparing for assessment workshop –People mix • The right mix is more important than the actual numbers • The EEO team @ TPS • Project Manager • Station Manager • Technical Lead • Engineers • M&T adviser • Operational and maintenance staff

  10. Undertaking the workshop • 1st Day - Setting the scene • Site tour and Introductions • From background paper to early identification of ideas • Preparing for next day • 2nd Day - More detailed investigation • Three break out groups • Early and Final ranking based on • Technical risk • Benefits • Costs

  11. Results of workshop • From 200 to 80 energy saving ideas • 20 - low technical risk, low cost and short payback • 52 EEOs now in updated EEO register • Five EEOs were suggested to be implemented • 1% saving of TPS’ energy consumed in FY 10/11 • An additional saving of 330,000 GJ - for investigation

  12. Learnings from the workshop • Know the legislation and regulations • Understand the company’s priorities • Engage Leadership early • Develop strategy early • Communication is key! • Getting the right set of people • Collaborate with DRET

  13. thank you • For further questions and information: • gabriele.sartori@stanwell.com • Mob: 0437 711 871