The Nosecone Calorimeter People, Management, Funding, Schedule. R. Seto Yonsei University Seoul, Korea Nov. 16, 2005. schedule. November 16th (Wednesday) 10:30 - 11:00 I.H. Park (Ewha) : Status of Silicon Fabrication in Korea 11:00 - 11:30 S.W. Nam (Ewha) : CREAM Silicon Detector
E N D
The Nosecone CalorimeterPeople, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005
schedule • November 16th (Wednesday) • 10:30 - 11:00 I.H. Park (Ewha) : Status of Silicon Fabrication in Korea • 11:00 - 11:30 S.W. Nam (Ewha) : CREAM Silicon Detector • 11:30 - 13:00 Lunch • 13:00 - 13:30 R.K. Seto (UCR) : Introduction and Physics Motivation • 13:30 - 14:15 E. Kistenev (BNL) : Design of the NCC • 14:15 - 14:45 RKS/EK (UCR/BNL) : Performance • 14:45 - 15:00 Coffee Break • 15:00 - 15:30 E. Kristenv (BNL) : R and D Progress • 15:30 - 15:45 R.K. Seto (UCR) : Money, Schedule etc • 15:45 - 16:00 J.H. Kang (Yonsei) : Manpower and Funding in Korea • 16:00 - 17:00 Tasks ahead (EK/RKS) and Discussion • 17:00 - 19:00 Dinner • November 17th (Thursday) – Visit SENS and ERTI
USA BNL:lab Physics (Management, Design, Integration, engineering etc) Chemistry (DAQ, electronics) Instrumentation (engineering, Gamma/pi0 design, front end chip) UCR (Simulations, management, software) ISU (Trigger, Simulations) UIUC (Simulations, Physics ideas) Nevis (chi – FEE readout) Korea (Si- pads/gammapi0) Yonsei Ewha SENS: company ERTI:company Japan Riken (lab) Czech Republic (Gamma/pi0 testing, constuction) Charles U Academy of Sciences Prague Tech U ON semiconductor:company Russia Moscow State U (Si pad design, testing, engineering) JINR-Dubna – 2 groups (lab) (Engineering, Mechanics, tungsten, assembly) MEPHI (front end electronics) Ekaterinbourg (company- board assembly) RIMST-ELMA (company-Si construction) Collaboration
Management Plan • Operate in the structure of PHENIX • The “Forward upgrades group” meets and works together (RKS chairs meeting now) • Muon Piston Calorimeter (3<eta<4) : going in now • Muon spectrometer trigger (NSF MRI funding) • NCC • We will have to work out a management structure – once we have all the responsibilities assigned • For construction (EK) • For Money DOE/Riken/Other (RKS)
40x design luminosity for Au-Au via electron cooling Commissioning Long term upgrades FVTX, TPC/GEM, NCC PHENIX view of RHIC Upgrade Plans Long term: full detector and RHIC upgrades Near term: Base line Medium term: first upgrades 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Analysis of data on tape Near term detector upgrades of PHENIX TOF-W, HBD, VTX , mTrig RHIC luminosity upgrade PHENIX upgrades Full utilization of RHIC opportunities: Studies of QGP with rare probes: jet tomography, open flavor, J/, ’, c, (1s), (2s), (3s) Complete spin physics program p-A physics RHIC baseline program Au-Au ~ 250 mb-1 at 200 GeV Species scan at 200 GeV Au-Au energy scan Polarized protons 150 nb-1 Extended program with 1st detector upgrades: Au-Au ~ 1.5 nb-1 at 200 GeV Polarized p at 500 GeV (start p-A program)
NCC Funding • Small amount of funding so far for R and D • Riken, UCR, BNL, Local Russian funding for themselves, Czech for themselves (a fair amount) • What do we need? • R and D • I claim with $3M in cash we can build one side, with $7M we can build both sides • this might change as we do a better cost estimate in the next month • Purchasing Si and W now (~200K worth Riken) • Major funding • Riken $1M-$3M • DOE ~$4M - $4.5M • Other ~$1M • Major question - timing
NCC Upgrade Schedule ScenarioEOB to BNL management: Oct 2005, RKS in LOI Today DOE, Japan, Russia,Czech ($4.0M+$4.0M+$0.5M???) doesn’t match funding schedule NCC2 Operational NCC prototype 1 test NCC prototype 2 test Begin NCC1 Construction NCC1 operational R&D Phase Construction Phase Ready for Data
NCC Upgrade Schedule Scenarioupdated Nov. 2005 Today DOE, Japan, Russia, Czech, other ($4.0M+$1 to 3M+$1M???) NCC1 operational NCC prototype 1 test (Protvino) NCC prototype 2 test Begin NCC1 Construction NCC2 Operational R&D Phase Construction Phase Ready for Data
NCC CDR • We want to appear in the 2007 budget • Need CDR to DOE by Feb • Dec – CDR to collaboration • Jan – review by BNL
Readers PHENIX folks Ahbay - spin, and pA Ed Kinney - Spin Atsushi - lots of it (design etc) Matthias - lots of it. Ken – spin Miraslov Finger (Charles Univ) Outside folks Raju Venugopalan (pA - saturation) Mark Strickman - nucleon strucutre Dima Kharzeev Writers RKS EK Mickey (spin) Ken (spin) Jen-Chieh (pA and nucleon structure) Mark Strikman (pA and nucleon structure) John L (hard scattering) jamie (charm and chic) Stefan (gamma-jet) Could use another person in each of spin, heavy ion, pA CDR writing/reading team
1. Executive Summary (RKS) 2. Physics Overview (a) Heavy Ion Physics i. Gamma-jet (John L I hope) ii. Chic (Jamie) iii. charm (Jamie) (b) pA collisions and the CGC (Jen-Chieh+R. Seto) i. direct photons ii. dileptons iii. hadrons iv. jets (c) Spin Structure of the nucleon (Mickey - how much?) i. W ii. Delta G Gamma-jet iii. Transversity (d) Nucleon structure (Jen-Chieh) 3. Physics Measurements with the NCC (RKS) (a) Performance i. Pi0 ii. Photons iii. Electrons iv. Jets (b) Physics reach i. Heavy Ion Physics ii. Spin Structure iii. Nucleon Structure (c) Physics reach with the all Upgrades CDR Outline
4. The design of the NCC (EK) (a) Overview (b) The Calorimeter (c) Gamma pi0 detector (d) Electronics (e) Mechanics and Cooling (f) Integration (g) Triggering 5. R and D (EK) 6. Project Management and Responsibilities (RKS) (a) Overview (b) Management Structure (c) Responsibilities 7. Budget and Schedule (RKS, EK) (a) Total Estimated Cost (TEC) (b) Contingency Analysis (c) Overhead (d) Budget (e) Fiscal Responsibilities (f) Schedule 8. Appendices outline (cont)
Schedule in the next couple months • CDR • Skeleton in CVS (CVS co offline/analysis/NCCCDR) • Major tasks • Writing • Cost estimate • Timeline • Dec ~4 CDR to collaboration • EC/DC etc review • Jan • BNL Review • Feb – To DOE • Beam Tests – now at Dubna (Vasily/Andrei with Merkin, Litvinenko etc) beam test 9th to 13th (1st prototype) • Korea Trip Nov 14-18 – EK/RKS • In the next year • Large prototype being designed (with gamma/pi0) • Full electronics
Commission NCC proto 1 Old Gannt chart from LOI
Upgrade Schedule ScenarioEOB to BNL management R&D Phase Construction Phase Ready for Data