1 / 13

Coudé Lab Instrument Interfaces BOULDER March 18, 2009

Coudé Lab Instrument Interfaces BOULDER March 18, 2009. Facility Services Provided. Utility building - Power - Chilled Water - Networking - Control Cables Compressed Air Telephone. S & O Building. - Vacuum - Nitrogen (gas) . Services Provided to Coudé Floor. Power

pillan
Download Presentation

Coudé Lab Instrument Interfaces BOULDER March 18, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coudé Lab Instrument Interfaces BOULDERMarch 18, 2009

  2. Facility Services Provided • Utility building • - Power • - Chilled Water • - Networking • - Control Cables • Compressed Air • Telephone • S & O Building - Vacuum - Nitrogen (gas)

  3. Services Provided toCoudé Floor • Power • 480 3Ф, 120, 120UPS • Coolant • constant temperature • Compressed Air • 100 PSI, 10 SCFM w/dew point -40C • Vacuum • 100 SCFM • Nitrogen (gaseous) • 0 – 5 L/m • Currently we are not planning compressed He

  4. Ground level Coudé Azimuth Wrap-up • Power • Coolant • Compressed air • Vacuum • Nitrogen, dry

  5. Coudé Azimuth Wrap-up to Cable-ways Coudé level Mezzanine Level • Cable-ways from wrap-up • Umbilical of cabling (coolant, control) • below removable flooring • connected to interface panels • provide power, coolant, and control • to instruments on coudé floor

  6. Coudé Floor Removable floor panels Cable access through steal floor

  7. Instrument Electronics Rack Location • Instrument racks 38U • 3 platform sides of floor • Cooled • Cabling out of top • Cable ways to openings • in floor • Signals to LIC • (Science Instruments & WFC)

  8. Mounting Instrument Tables on Coudé Floor • Table Support Beams attached to major coudé floor supports • Isolation pads

  9. Networks Provided • 2.1.4.1 Communication; Ethernet • Provides 1000BASE-SX, 802.3z-1998, • Ethernet connection onto facility communication LAN • Multi-mode 62.5/125, Duplex SC type connector • 2.1.4.2 Data; Fibre Channel , • Provides 1000BASE-SX, 802.3z-1998, • Ethernet connection onto facility data LAN • Multi-mode 62.5/125, Duplex SC type connector • 2.1.4.3 Safety; Ethernet, • Provides 100BASE-SX, 802.3-2008, • Ethernet connection onto facility safety LAN • Multi-mode 62.5/125, Duplex SC type connector • 2.1.4.4 ATST Synchrobus; • IRIG-B • Fiber pair (duplex SC), Single-mode fiber

  10. Network Cables • Fabric used • Copper CAT5e • Fiber Multi-mode pairs, single-mode pairs • All Networks are full duplex; therefore, • Fiber connections are made through use of • SC (duplex) connectors • Copper utilizes RJ-45 connectors

  11. Control Cables • Four defined types • 24V control signal • 16 AGW, stranded, shielded, PVC, energy-chain rated • limit switch, proximity switched, relay control, e-stop • Non-defined, twisted pair • 16 AGW, stranded, twisted pair, shielded, energy-chain rated • Differential digital signals (TTL), differential analog • Coaxial 50 • RF, audio, single highly-modulated signal (clock) • Coaxial 75 • Video

  12. Coudé level • Facility services to Instrument Lab • Power: 480 3Ф, 208 3Ф, 120UPS • Coolant: constant temp • Compressed air • Vacuum • Utility Chase • Fiber • Phone • Control

  13. ~ END ~

More Related