An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Management (Instrument, ICC) Otto H. Bauer MPE Garching Management

  2. Management

  3. Personnel Affiliation F.T.E.´s Industry (F.T.E.´s) MPE 19.0 Fa. Markl 3.0 MPIA 7.0 Fa. Zeiss (?) KT 10.0 CASE,.. 7.0 ANTEC 5.5 - IMEC 1.5 IMEC Ind. 4.0 CEA 11.0 ? CSL 8.5 CRISA (?) IAC 0.5 CRISA (?) IFSI 1.9 Gavazzi 2.0 ------- 64.9 Management

  4. PACS Science Team Science Coordinator D. Lutz ICC Manager O.H. Bauer S/W Development & Maintenance E. Wiezorrek Operations H. Feuchtgruber Management Structure NHSC/IPAC K. Ganga S/W System Eng. / ICC Deputy R. Huygen ICC Deputy E. Sturm Support E. Wieprecht Calibration U. Klaas Management

  5. Personnel Affiliation F.T.E.´s MPE 10.4 MPIA 1.3 UJena 0.5 KUL 5.0 IFSI 2.0 Padua 1.0 CEA 0.8 UVIE 0.3 -------- 21.3 Management

  6. Critical Areas • Management • Liaison Project/Alcatel/Astrium/Instrument Team still not clear and with a lot of friction • Set-up, duration and costs of cryo vibration at CSL not clear  User meeting urgently needed • Liaison with IAC/CRISA extremely difficult (not enough personnel?) • Monthly reporting still problematic • PA/QA activities not yet up to speed • Schedule: AVM/CQM tests can only start in April 2003 Delivery only beginning of December 2003 Management

  7. Critical Areas (II) • Funding • MPE: • MoU signed by all parties, except OAMP Marseille: DLR blocked funding for KT in 2002  solution in progress • Max-Planck-Gesellschaft has funding problems due to new institutes in the new countries: Financing of test cryostat + test optics not possible  Need DLR support (out of our reserves) • Manufacture of FPU structure more expensive than expected  Need DLR support • IFSI: • Costs of MIL quality QM parts: 460 kEuro, not foreseen in budget: Participation to meetings drasticly reduced  ? • CEA: • Costs of parts much higher than expected: No reserves anymore  ? Management

  8. Critical Areas (III) • Spacecraft Interfaces still not frozen • Thermal Model • Straylight • Cryo harness • Straps (2 K support structures) • Alignment • SVM  Very risky situation, as we have completed our design and started manufacturing Management