An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013年度檢視(程式部門) By Chun

  2. 專案工作依功能劃分太單一,易造成人員的倦怠感專案工作依功能劃分太單一,易造成人員的倦怠感 • 駐點人力分配,資源於專案初期未規劃,造成後續資源短缺 • 認知上的差異,造成溝通成本提高 • 部份資訊掌握於個人主機,以致無法由它人代理解決 • 文件標準規範未落實 • 備援人力未能妥善分配 • 維護性擴充案件易被遺忘(EX: 空大) 2013年部門檢視(程式)

  3. 人員時程未能確實掌握 • 資源未能有效運用 • 插件多,原訂工作易被排擠 2013年部門檢視(美術)

  4. 專案管理主要集中於一人之手 • 人力資源短期斷層 • 內部時程未先行溝通,造成資源衝突 2013年部門檢視(企劃)

  5. 資源評估未儘理想,造成時程錯估 • 美術資源衝突,而版面確認時間後延,程式開發品質不穩定,造成客戶觀感不佳 • 案件驗收後,上線期間及維運期間過長,而影響到後續原訂案件 • 新進小案常被忽略,常造成救火狀況 • 客服回應時間拖得太長 2013年整體檢視