An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EURISOL Design Study NUPECC MEETING LNF - DECEMBER 5th, 2003

  2. The EURISOL status report • The Task Group reports are to be supplied as Appendices to the EURISOL Report, and are now at the Printer. Proofs will be received shortly, and printing should take place during December 03. • The main document, "The EURISOL Report" itself is almost complete, and will be circulated to the EURISOL Steering Committee members for final comment and corrections, and will then be printed in early January 2004. • 600 copies of the Report plus the 5 separate companion volumes of the Appendices will be mailed out thereafter. A CD version will also be available, together with the report, and also separately.

  3. EURISOL Design Study EURISOL DESIGN STUDY ACTION GENERAL INFORMATION AREA OF INTERVENTION SUPPORT SCHEME INSTRUMENT

  4. EURISOL Design Study FP6-2003-INFRASTRUCTURES-4 CALL SPECIFIC INFORMATION

  5. EURISOL Design Study EURISOL DESIGN STUDY: THE SCIENTIFIC GOALS

  6. EURISOL Design Study EVALUATION CRITERIA FOR SPECIFIC SUPPORT ACTIONSThe evaluation criteria are organized in four different areas, to each area specific weight and threshold are given . The final threshold of the proposal is : 3.5/5

  7. EURISOL Design Study EVALUATION CRITERIA FOR SPECIFIC SUPPORT ACTIONS

  8. EURISOL Design Study PROPOSAL STRUCTUREA COMPLETE PROPOSAL HAS TWO PARTS: PART A AND PART B

  9. PREPARATION O F THE EURISOL.DS PROPOSAL:IMPORTANT MILESTONES YEAR 2003 • MAY 12th THE WRITING GROUP (G. FORTUNA, P. BUTLER, Y. BLUMENFELD) IS APPOINTED BY THE EURISOL STEERING COMMITEE AT THE ORSAY MEETING) • END OF JULY THE CALL FOR COLLECTING LETTERS OF INTEREST TO PARTICIPATE IN THE EURISOL. DS IS LAUNCHED. • SEPTEMBER 20th FOURTY LETTERS OF INTERERST FROM ABOUT 20 DIFFERENT INSTITUTIONS ARE COLLECTED BY THE WRITING GROUP. • OCTOBER 2nd,3rd AT THE EURISOL STEERING COMMITTEE MEETING HELD AT LNL 11 DIFFERENT TASKS ARE IDENTIFIED AND THE TASKS LEADERS APPOINTED. • NOVEMBER 14th AT ORSAY FIRST OPEN MEETING OF THE TASK LEADERS WITH THE WRITING GROUP. A PROVISIONAL WORK PLANNING OF THE VARIOUS TASKS IS PRESENTED AND DISCUSSED.

  10. EURISOL Design Study

  11. EURISOL Design Study 1 BRIEF DESCRIPTION OF THE TASKS 2 3

  12. EURISOL Design Study 4 BRIEF DESCRIPTION OF THE TASKS 5 6

  13. EURISOL Design Study 7 BRIEF DESCRIPTION OF THE TASKS 8 9

  14. EURISOL Design Study 10 BRIEF DESCRIPTION OF THE TASKS 11 12

  15. INPUTS FROM ORSAY MEETING • Need of better defining the “border lines” of the various tasks • Need of a strong (sub)coordination of the 3 accelerators (targets) related tasks • Strong indication of concentrating the resources on accelerators and targets tasks(6M€ out of 9M€) • Need of involving SMEs and non-european( VI FP) partners( Triunf, Vinca…..) • Dec.1st,03: final instructions including tabular forms to the task leaders

  16. MANAGEMENT SUPPORTING GROUP • SCIENTIFIC SECRETARY • ADMINISTRATION • TECHNICAL COORDINATOR PROJECT ADVISORY COMMITTEE 3 Members MANAGEMENT GROUP COORDINATOR+2 Members Responsibility for the Execution of the contract • STEERING COMMITTEE • MANAGEMEMENT GROUP + Representatives of the participating institution • 1 Meeting/Y • Approval of the planning • Monitoring of the use of resources • COORDINATION BOARD • Management Group +Task Leaders • 2-3 Meetings/Y • Scientific&Technical Planning • Task Coordination&Global Coherence • ANNUAL PARTICIPANTS MEETING • 1 Meeting/Y • Information Plan between the Project and the Community Task 1 Task 2 Task n

  17. Preparation o f the Eurisol.ds Proposal:Important milestones YEAR 2004 • JANUARY 8th DEADLINE FOR THE PREPARATION OF AN ADVANCED DESCRIPTION OF THE TASKS CONTAINING: WORK PLANNING, MILESTONES, DELIVERABLES AND REQUESTED RESOURCES. • JANUARY 26th PARIS: JOINT MEETING OF THE WRITNG GROUP AND THE EURISOL STEERING COMMITTE TO EXAMINE THE STATUS OF THE PROPOSAL AND ITS GLOBAL COHERENCE. • FEBRUARY 16tH CERN: OPEN MEETING OF THE WRTITING GROUP AND THE TASK LEADERS FOR THE UPDATE OF THE PROPOSAL DRAFT