1 / 17

NATF Readiness Update Brandon McElfresh June 1, 2010

NATF Readiness Update Brandon McElfresh June 1, 2010. Special Topic – Nodal Registration Cutoff – QSEs and CRRAHs. Scope What is the cutoff date for QSEs and CRRAHs to begin registration for Nodal Go-Live from the 168 hour test to Nodal Go-Live (based on ERCOT resource availability)?

Download Presentation

NATF Readiness Update Brandon McElfresh June 1, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATF Readiness UpdateBrandon McElfresh June 1, 2010 http://nodal.ercot.com 1 June 2010 NATF Meeting

  2. Special Topic – Nodal Registration Cutoff – QSEs and CRRAHs • Scope • What is the cutoff date for QSEs and CRRAHs to begin registration for Nodal Go-Live from the 168 hour test to Nodal Go-Live (based on ERCOT resource availability)? • Registration must begin by these dates to be qualified for Nodal Go-Live • August 13th, 2010 • QSEs with Resources with a new WAN connection * • CRRAHs (to be qualified for the 10/13 PCRR nomination and for the 11/11 December 2010 CRR Auction) * ~ • October 1st, 2010 • QSE with Resources using a Nodal qualified service provider * • QSEs without Resources * • Sub-QSEs using a Nodal qualified parent QSE * • Mechanics • Qualification will follow the Nodal production qualification process and all testing will be done in the MOTE environment • MPs that want to begin registration past these deadlines will be examined on a case-by-case basis • Nodal Metric MP22 will measure progress of new entrants QSERs (new wan), CRRAHs QSERs (existing wan), Sub-QSERs, QSEs w/o Resources • * QSE Application or CRRAH Application must be submitted, which includes Credit Application • ~ Doesn’t include NOIE Allocation Eligibility Form, which must be submitted by 6/30 for CRRAHs eligible for PCRRs http://nodal.ercot.com 2 June 2010 NATF Meeting

  3. Participant Readiness Touch Points 2010 June July August September Meetings • NATF 6/1 and 6/29 • NATF 8/3 and 8/31 • TBD • TBD • Nodal 101 • LSE 201 • Generation 101, 201 • Economics of LMP • CC Workshop • Retail Workshop (6/17) • VC Workshop (6/22) • AS Workshop (6/30) • Nodal 101 • Transmission 101 • Generation 101, 201 • Basic Training Program • NOIE QSE Operations • Settlements 301 • Nodal 101 • Transmission 101 • Generation 101, 201 • NOIE QSE Operations • Settlements 301 • MMS & MIS GUI (Online only) • Nodal 101 • Transmission 101 • Generation 101, 201 • Basic Training Program • NOIE QSE Operations • Settlements 301 Training • TSP OS Road Show • Settlement Metrics • Telemetry Quality Metrics • Standby site visits • Standby site visits • MRS #5 168 Hour Test (Tentative) • Dispute & Reports Metrics • Standby site visits Outreach • Weekly Trials calls • 8 hr system-wide LFC test • Weekly Trials calls • Prepare for 168 hr test • Weekly Trials calls • Execute 168 hr test • Weekly Trials calls • 48 hr system-wide LFC test • Verifiable costs in execution • NPRR206 in execution Market trials http://nodal.ercot.com 3 June 2010 NATF Meeting

  4. Next 60-days of Classes/Workshops Enrollment at: http://nodal.ercot.com/training/courses/index.html http://nodal.ercot.com 4 June 2010 NATF Meeting

  5. Next 60-days of Classes/Workshops - continued Enrollment at: http://nodal.ercot.com/training/courses/index.html http://nodal.ercot.com 5 June 2010 NATF Meeting

  6. Active Nodal Metrics http://nodal.ercot.com 6 June 2010 NATF Meeting

  7. RED/AMBER Metrics Summary Market Participant Metrics ERCOT Metrics * ERCOT is also scored on the connectivity metrics, so MP15-B is RED on the ERCOT scorecard as well. http://nodal.ercot.com 7 June 2010 NATF Meeting

  8. New Metrics 2010 June July August September • MP21 WGR ICCP Met Telemetry • CO5 RT Statements • CO6 RT Invoices • EMO3 Verify OE Functionality • EMO9(A) State Estimator Performance • MO3 Verify SASM • MO8 Verify DAM Execution Quality • E7 Validate ISM Access for IMM • E10 Validate ISM, CDR, and Lodestar Report Access for Internal Use • MP22 New Entrant Readiness • EMO9(D) Validate Zonal and Nodal Security Analysis (all security violations • CO2 Verify Disputes • CO3 DAM Statements • CO7 DAM Invoices • C10 Credit Calculations • EMO2 Verify Voltage Support • EMO9(C) Validate Zonal and Nodal Security Analysis (CSCs) New Metrics http://nodal.ercot.com 8 June 2010 NATF Meeting

  9. MP21 Wind Generation Resources ICCP Meteorological Telemetry • Scope • This metric will measure WGRs ability to submit required MET based on Nodal Protocols 3.13 Renewable Production Potential Forecasts and 4.2.2 Wind-Powered Generation Resource Production Potential • Required MET Data • Wind Speed (mph); • Wind Direction (degrees); • Temperature (Celsius); and • Barometric Pressure (mbar) • Current Statistics • 40 out of 84 WGRs meeting reasonability tests (as of 4/30) • Risks inconsistent submissions and poor forecasting • Impacts on future forecasting since WGRPP relies on historical meteorological data • Impacts on the need for Ancillary Services • Impacts on DRUC and HRUC http://nodal.ercot.com 9 June 2010 NATF Meeting

  10. BACKUP SLIDES http://nodal.ercot.com 10 June 2010 NATF Meeting

  11. Metrics Roadmap Timing and Design Confirmed PURPLE Timing subject to change, design in progress ORANGE New Metric N1 EMO1 EMO10 EMO7 MP6 MP15A EMO6 EMO9(A) EMO9(C) EMO9(D) MO5 MO4 EMO2 N2 EMO9(B) EMO13 EMO8 MP3 MP23 MP15B CRR3 MP20 EMO3 MO3 MO8 MP3 MP16 MO10 MO9 MO7 C10 CO8 CO5 CO3 CO9 E5 CO2 C1-C10 CO4 R0 CO6 CO7 R2 CO1 R1 R3 IMM1 E12 CRR4 MP11 MP14C E9 E3 MP22 E1 E7 E10 http://nodal.ercot.com 11 June 2010 NATF Meeting E11

  12. CRR Metrics http://nodal.ercot.com 12 June 2010 NATF Meeting

  13. Real-Time Metrics http://nodal.ercot.com 13 June 2010 NATF Meeting

  14. Day-Ahead Market Metrics MP16 – Metric is based on a 2 week rolling average (5/18-20, 5/24-28 – 8 runs). MP16 – 98% Load participating. http://nodal.ercot.com 14 June 2010 NATF Meeting

  15. Network Modeling Metrics Network Model Metrics MP6 does not include 405 QSE CB and DSC points from TSP outreach. ERCOT is determining whether these rollback into the QSER MP6 measurement. http://nodal.ercot.com 15 June 2010 NATF Meeting

  16. Network Model Metrics Network Modeling Metrics http://nodal.ercot.com 16 June 2010 NATF Meeting

  17. Other Readiness Metrics http://nodal.ercot.com 17 June 2010 NATF Meeting

More Related