1 / 29

CSE 242A Integrated Circuit Layout Automation

CSE 242A Integrated Circuit Layout Automation. Lecture: Global Routing Winter 2009 Chung-Kuan Cheng. Outline. Menu Multi-Commodity Flow Top-Down Approach Steiner Tree. Global Routing Menu. Global Routing MCF. LP & Duality. Net Ordering. Global Routing Top-Down Approach. P2. P1. 4.

psprague
Download Presentation

CSE 242A Integrated Circuit Layout Automation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSE 242A Integrated Circuit Layout Automation Lecture: Global Routing Winter 2009 Chung-Kuan Cheng

  2. Outline • Menu • Multi-Commodity Flow • Top-Down Approach • Steiner Tree

  3. Global Routing Menu

  4. Global Routing MCF • LP & Duality

  5. Net Ordering

  6. Global RoutingTop-Down Approach

  7. P2 P1 4 T(1)…T(4) P1 P2 2 T(5)…T(6) P3 P1 P2 4 P4 P3 T(7)…T(10) P1 P2 1 T(11)

  8. Linear Programming V1 H1 H2 V2

  9. Steiner tree

  10. Maze Routing • Breadth First Search: • Map memory reduction 1 2 1 1 2 2 2 1 1 2 2 1 1 2 2 1 1 1 2 2 1 1 S 1 1 1 2 2 1 1 1 1 2 2 1 2 2 1 2 2 2 1 2 1 1 3 1 1 3 2 3 1 1 3 2 1 2 1 3 2 1 S 1 1 3 2 1 2 1 3 2 3 1 1 3 1 1 A sequence that guarantees the predecessor is different from its successor. # states: 1, 2, Empty, Filled, 1, 2, 3

  11. Speed-up • Limit to a bounding box * 120% • Start from two ends • Expand from the corners farthest from the center • Expand the frontier closer to the target first t s

  12. Depth First Search 5 4 Line probe 3 3 2 4 1 2

  13. A* router t i s

  14. Ripup and Reroute B • Net sequence ordering • Penalty function on overlapping • Route around existing wires • Plowing or compaction • Topological routing C A

  15. Ripup and reroute with cost driven router

  16. Overlap Model

  17. 6 7 8 1 2 3 4 5 5 4 7 1 3 2 6 8

  18. Hybrid Router

  19. River Routing • Net Ordering • For each pin (circular order) • If it is a starting pin, push • Else if is ending pin, pop into a queue. • Route nets to follow contour 3 2 4 6 6 5 5 4 2 3

  20. Planar Routing • Power & Ground Distribution • Find a cut line that separates the chip into two regions • Obj: min tree length P + treelength G P G G P P G

  21. Gate Matrix Vdd A 1 3 B 4 A B 2 5 Z B A 9 8 A 6 7 10 B

  22. 2 1 4 5 3 7 6 9 10 8 Z C A B

  23. Cell Generation Vdd Vdd B A A B C C D Z Z D Z A D C C D A B B

  24. Vdd 3 A B A B 4 4 3 C C 2 2 Z D 1 1 D Z

  25. Find an Euler path on graph G & its dual with same sequence of labels • Given serial & parallel graph, the operation is commutative 1 1 1 2 2 2 3 2 1 3

  26. Compaction 1 1 2 3 4 5 9 ‘ 7 8 6 t S

  27. Compaction with Wire Jogging

  28. Compression ridge 45 degree path

More Related