Preparing the European fusion roadmap for FP8 and beyond

Preparing the European fusion roadmap for FP8 and beyond. Context : a difficult situation for the Accompanying programme. Decrease of funding for Associations through FP7 Not compensated by F4E contracts (grants for 2010 = 10 MEuros). JET ILW. Source : CCE-FU50

raanan
Download Presentation

Preparing the European fusion roadmap for FP8 and beyond

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparing the European fusion roadmap for FP8 and beyond

  2. Context : a difficult situation for the Accompanying programme • Decrease of funding for Associations through FP7 • Not compensated by F4E contracts (grants for 2010 = 10 MEuros) JET ILW Source : CCE-FU50 * : data not consolidated for 2011

  3. 150 Meuros : average early FP7 135 Meuros : subsistence level More difficult times to come ? ? ? • Source : CCE-FU50 • : data not consolidated for 2011 • 2012-2013 : still under discussion, based on Financial Perspectives only • Open letter from CCE-FU : • 135 MEuros to keep the accompanying programme alive • 120 MEuros as bare minimum for 2012-2013

  4. Existing basis : • Facility review (2008) • Hasinger report • Various assessments (JET, …) • CCE-FU51 : • HLWG for the workshop : C. Cesarsky, S. Cowley, S. Guenter, S. Paidassi, • A. Pizzuto, J. Sanchez, R. Weynants  detailed roadmap based on input from Associations • political paper : S. Paidassi, C. Cesarsky, P. Garderet, J. Sanchez, MQ Tran, • C. Varandas, B. Vierkorn Rudolph  document from Commission for FP8, •  Inputs for a strategic roadmap from the Commission for the fusion programme • Workshop as a first step to build a common global EU programme for FP8 (for the period up to 2020) A strong programme needed for FP8 • Several steps : • Input from Associations along the 4 objectives from the Hasinger report : • Objective 1 : ITER construction • Objective 2 : securing ITER operation • Objective 3 : preparing ITER generation • Objective 4 : fusion power plants • Technical analysis by EFDA STAC (with all the gratitude from HLWG …) • Workshop : what do we want to do? Common projects should emerge • Roadmap : draft for CCE-FU may 2, final version for CCE-FU Oct 5

  5. Resources Resources Resources R&D prog ITER + BA R&D prog R&D prog ITER + BA ITER + BA DEMO DEMO 100 % 1 4 2 1 1 4 4 2 2 Objectives Objectives Objectives 2 (+ ?) scenarios DEMO Scenario 1: ITER and DEMO asap Scenario 3 (?) : ITER construction only Scenario 2: ITER construction + EU return of investment for ITER exploitation

  6. Day 1 : • Session 1: R&D needs • ITER R&D needs : priorities (R. Pitts remote for IO) • F4E needs for ITER construction (G. Federici for F4E) • DEMO R&D needs (MQ Tran) • Session 2 : Contribution from Associations Agenda • Day 2 : • Session 3 : Common programme • EFDA • Broader Approach • IFMIF • Industry • Session 4 : Summary of the Associations input by STAC • Objective 1 : ITER construction • Objective 3 : preparing ITER generation • Objective 2 : securing ITER operation • Objective 4 : fusion power plants Next steps : The way forward : next steps to build the roadmap General discussion Conclusion