An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Faculty Meeting Monday, April 4, 2011

  2. Deferred Maintenance

  3. Campus Profile

  4. Deferred Maintenance

  5. Annual Facilities Budget

  6. Campus Profile

  7. Renovation Planning No. Major Buildings: 31 Ave. Age: 53 years Ave. Size: 48,848 gross square feet Complete renovation every 100 years ($200/gsf) and major renovation every 50 years ($100/gsf) = $4.5M / year One complete AND one major renovation every 3 years Last renovation project: Severance Hall 2003

  8. 2011-2012 Facilities Project List Annual Residence Hall Improvements: Annual Residence Hall Improvements: Goodhue student rooms Townhouse furniture Annual Campus/Grounds Projects: pavement, walks, etc. Construct parking lot at Second and Union Nourse Quad landscaping Install bike racks at the Library Begin Chapel grounds restoration Remove parking along Bald Spot Relocate softball field Remove Arb tennis courts (insurance proceeds) Laird Track replacement (insurance proceeds)

  9. Facility System Replacement and Repair Building Envelope (roofs, windows, exteriors) Willis tuckpointing - last remaining wall Strawbale warehouse - enclose w/permanent sides Nutting House & garage - replace roofs Burton roof replacement Watson window replacement Goodsell Observatory - replace roof, soffits Olin roof (partial) replacement Sevy/Burton decks - abate and replace Laird Hall tuckpointing Library roof replacement Elevators Remaining upgrades (Willis, Nourse, M&D, Sayles-Hill, Evans) Construct Burton/Davis link and install new elevator Mechanical, Electrical, Plumbing Siemens (EMS) system replacements - Year 2 of 5 Other Laird Stadium restoration - 09/24/10 Flood (insurance proceeds)

  10. Watson Hall Windows

  11. Goodsell Observatory Roof & Soffits

  12. Goodsell Observatory Roof & Soffits

  13. Goodsell Observatory Roof & Soffits

  14. Laird Tuck-pointing

  15. Laird Tuck-pointing

  16. Library Roof Replacement ROOFS RECENTLY REPLACED

  17. Burton/Davis Elevator Link