CSC DQA and Commissioning Summary. We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility We are ready for first collisions We are also responsible for commissioning/operation of the CSC detector

ramla
Download Presentation

CSC DQA and Commissioning Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC DQA and Commissioning Summary • We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility • We are ready for first collisions • We are also responsible for commissioning/operation of the CSC detector • This activity was limited because of the ongoing CSC ROD problems 10/5/2014

  2. CSC DQA Status • Accomplishments • Developed online (GNAM) and offline (Express Stream and Tier0) monitoring packages • For both shifters and experts • At raw, PRD, cluster, segment, and track levels • Integrated, maintained, and validated with ATLAS software • Simultaneously validated CSC reconstruction software • This is the most time consuming task 10/5/2014

  3. CSC DQA Status • Accomplishments continued • Developed associated DQMF , OHP, and HAN files for actual DQ and display • Ensured calculation and DB storage of online and offline DQ flags • Provided documentation on ATLAS and ATLAS Operations Twikis • We continue to optimize the DQA using feedback from CSC cosmic ray runs and eventually collider data 10/5/2014

  4. CSC Online DQA Results • Run 125032 - errors

  5. CSC Online DQA Results • Run 125032 – layer maps

  6. CSC Online DQA Results • Run 125032 – time distribution

  7. CSC Offline DQA Results • Run 125032 – Layer and channel maps

  8. CSC Offline DQA Results • Run 125032 – Strip and cluster charge

  9. CSC Offline DQA Results • Run 125032 – Landau fits for DQ Side C (-1 to -16) MPV of fit shown Side A (+1 to +16) MPV of fit shown C: Qsumdistribution per layer A: Qsum distribution per layer