Pre-Proposal Conference July 8, 2009

Step 1 Instructions RFQ for Medical Equipment Planning. Pre-Proposal Conference July 8, 2009. Introductions. Program Scope. 1,900,000 SF 862 Adult-Bed Acute Care Hospital 385,000 SF Clinic Center 165,000 SF Office Center 2,500 Parking Garage 2,500 Surface Parking Central Plant.

rashad
Download Presentation

Pre-Proposal Conference July 8, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Step 1 Instructions RFQ for Medical Equipment Planning Pre-Proposal ConferenceJuly 8, 2009

  2. Introductions

  3. Program Scope 1,900,000 SF 862 Adult-Bed Acute Care Hospital 385,000 SF Clinic Center 165,000 SF Office Center 2,500 Parking Garage 2,500 Surface Parking Central Plant

  4. Project ScopeLocation

  5. BackgroundSITE LOCATION DART Station Hospital site ASC

  6. Parkland Contracts

  7. Scope • Develop Medical Equipment and Systems Responsibilities Matrix. • Survey Medical Equipment • Class I (fixed), • Class II (major movable), • Class III (minor movable) Medical Equipment in the existing hospital. • Establish and maintain a comprehensive equipment database. • Develop equipment specifications. • Develop equipment floor-plan layouts and elevations. • Develop equipment budgets. • Prepare Purchase Orders. • Assist Parkland with the purchasing. • Track the medical equipment supply chain. • Plan and install mock-ups. • Integrate equipment with EMR.

  8. Objectives • Parkland’s medical equipment needs are clearly, accurately, completely defined and coordinated at every facet of the supply chain. • Equipment design features and performance are optimized. • Clutter is minimized. • Design Phase Coordination ensure that medical equipment infrastructure requirements are addressed in the design. • Construction Phase Coordination addresses medical equipment “commissioning” requirements. Equipment is procured, tagged, set up, installed, deployed, and tracked. • There is full biomedical equipment integration with Electronic Medical Record systems. • Occupancy Phase. Training, maintenance, and reporting arrangements are addressed. • This engagement contributes a fair share toward meeting Parkland’s 25% MWBE goal.

  9. Scoring Criteria • Criterion 1. Company Profile and Resources. (Weight – 20 points) • Criterion 2: Relevant Medical Equipment Planning Experience and Technical Knowledge. (Weight - 30 points) • Criterion 3. Workforce Assets Available for this Project. (Weight - 20 points) • Criterion 4. References and Sample Work Products (Weight – 20 points)

  10. Selection Milestones Written Questions Friday, July 10, 2009 Statements of Interest and Qualifications 2:00 pm, Friday, July 21, 2009 Short list Announced July 31, 2009 Step 2 RFP and Presentations August 14, 2009

  11. “New Parkland” Website www.parklandhospital.com/newparkland

  12. Parkland Expansion Boundaries