An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trail Assessments: what are they and how do we do them? Mid-Atlantic Regional Partnership Committee October 15, 2005

  2. What is a Condition Assessment? 1 Inventory Trail Assets 2 Determine Condition of Trail Assets 3 Manage Assessment Information

  3. A.T. Asset Trail – surface, erosion control structures, steps, crib walls, minor trail bridges > Major Bridges – over 20’ long and 10’ off the ground, or complex design > Buildings – shelters, privies, retained and excess structures > Campsites – constructed or managed > Parking Lots – constructed or managed > Boundary line – Exterior Corridor Boundary Survey >

  4. Collecting Information GPS Use Resource Grade GPS units > “Data Dictionary” > Collect Location and Attribute Information at the same time > Integrate data into our GIS >

  5. Inventory 1 TRAIL GPS surveyed in 1999 > Updated in 2002-2003 > Provided an accurate location of AT footpath > Only necessary to update relocations >

  6. Inventory 1 SHELTERS Location > Dimensions > Construction Type > Capacity >

  7. Inventory 1 PRIVIES Location > Dimensions > Construction Type > Privy Type >

  8. Inventory 1 CAMPSITES Location > Dimensions > Capacity > Type designated, user created, bootleg/illegal >

  9. Inventory 1 MAJOR BRIDGES Location > Year Built > Bridge Type Use Forest Service Definitions > Bridge Materials > Name >

  10. Inventory 1 PARKING LOTS Location > Year Built > Surface > Dimensions > Capacity >

  11. Assessments 2 TRAIL PROBLEMS Identify Deficiency > Note Actions to Correct Deficiency > Materials Needed > Estimated Person days > Evaluation > Trail Crew >

  12. Assessment 2 OTHER PROBLEMS Identify Deficiency > Note Actions to Correct Deficiency > Materials Needed > Estimated Person days > Evaluation > Trail Crew >

  13. Information Management 3 DATA Field Data is Processed edited & corrected > Data is imported into an ATC Database GIS & Access, under development > Data is also used in NPS Database FMSS > Data is used by NPS to Request Project Funding >

  14. Information Management 3 PHOTOS Document Assets > Used for Project Planning > Stamped with Info > Linked to GIS > Eventually Accessible in ATC Database >

  15. Information Management 3 GIS Data Integrated into ATC GIS > Can be Viewed in Relation to Other Features – Land Ownership Natural Resources Cultural Resources Other Trail Projects > Can be used to Produce Maps >

  16. Information Management 3 TRAIL ASSESSMENT CYCLE Gather Quality Field Data > Develop Project Priorities from Data > Request Funding Based on Project Priorities > Update Data >

  17. Information Management 3 AT PROJECT MANAGEMENT CYCLE Raw Data see Field ATPO A.T. Database HQ = Club Condition Assessment Data = ATC Five-Year Plans = ATPO Finalized by Aug 15 Annually by Aug 31 Reports due by Sept 30 Compile Estimate Field season Costs Estimated by Sept NPS funds by late-Feb RPC Approved by Sept see RPC RPC BOD Approves Budget, Nov NPS deadline by Mid-Feb Compliance PMIS FMSS ATPO Budgeting ? ATC Budgeting ATC Fundraising

  18. 2004 Assessment METHOD 20% of the AT was Assessed in the Field > AT Sections were Randomly Selected > Extrapolated Assessment Results to Entire Length of AT > Established a Base-line Condition for the AT Based on Field & Extrapolated Data > 20% of the AT will be Assessed in the Field Each Year >

  19. 2004 Assessment RESULTS Based on Field and Extrapolated Data: 43% (951 mi.) of AT is in “Good” Condition > 31% (687 mi.) of AT is in “Fair” Condition > 24% (539 mi) of AT is in “Poor” Condition > 0% of AT is in “Serious” Condition > Condition of AT is Determined by it’s “Facility Condition Index” - FCI > Replacement Value/Deferred Maintenance $ >

  20. 2005 and Beyond… 20% of the AT will be Assessed in the Field Each Year > Clubs and Volunteers are Integral to Assessment Process > Data will be Used to Update and Replace Existing Information > Data will be Used to Plan Projects and Request Future Funds >

  21. GPS Equipment GeoExplorer 3 GeoExplorer XT Recon w/Pocket GPS