1 / 17

Advancing the Development Of Nuclear Power In China

Advancing the Development Of Nuclear Power In China. Changli YANG Vice President China National Nuclear Corporation. About CNNC. China National Nuclear Corporation (CNNC) is a large state-owned enterprise with over 100 subsidiaries.

rene
Download Presentation

Advancing the Development Of Nuclear Power In China

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advancing the Development Of Nuclear Power In China Changli YANG Vice President China National Nuclear Corporation

  2. About CNNC • China National Nuclear Corporation (CNNC) is a large state-owned enterprise with over 100 subsidiaries. • Three leading industries: nuclear power, nuclear fuel cycle and application of nuclear science and technology.

  3. uranium exploitation and mining CNNC Environmental Protection spent fuel reprocessing Uranium Production Enrichment Conversion Design, Construction, Operation,Management of NPP Fuel Element Fabrication A Complete Nuclear Industry System

  4. Achievements In Nuclear Power • 3 nuclear power bases • 9 operational units • 52.3TWh in 2005.

  5. A target: 40GWe by 2020 To build 2-3 units of 1000MWe each year in the next 15 years.

  6. Strategies • Starting from existing foundation and technology • Introducing advanced technologies from other countries • Accelerating R&D and application of new technologies

  7. Unit 3 and 4 in Qinshan II Duplication Projects Projects of Qinshan II and Ling’ao II have obtained the approval from the Chinese government

  8. Sanmen Site International Bidding Building Sanmen NPP in Zhejiang and Yangjiang NPP in Guangdong by introducing Generation III technology through international bidding.

  9. CNP1000核岛工艺系统图 Working on CNP1000 • Design life: 60y • Refueling Period: 18m • Availability: 87% • Site: Fangjiashan at Qinshan

  10. Pushing the demonstration project of large advanced PWR NPP • A key project of national importance. • To develop GIII technology to improve safety and economics on the basis of GII.

  11. For long-term development • Study on the fast breeder reactor • The 65 MWt China Fast Experimental Reactor is under construction. • Making transitional arrangements for ITER project Fast Breeder Reactor

  12. Development of Uranium Resource • Upgrading equipments • Exploring new mines • Promoting Production • Adopting new technology

  13. Nuclear fuel cycle • Improving the capacities of nuclear fuel elements manufacturing and uranium conversion • Doing uranium tests at the spent fuel interim facility • Planning on setting up a commercial reprocessing facility

  14. Setting up specified nuclear power companies • Two AE companies have been established. • Preparing for a nuclear power service company.

  15. Human resources • The rapid development of nuclear power calls for more nuclear power professionals • Working with universities to co-training engineers • Setting up trainees’ centers for fresh graduates

  16. A bright future for China’s nuclear industry . • CNNC wishes to further cooperation and communications with all the colleagues worldwide in the nuclear community.

  17. Welcome you all to China!

More Related