1 / 5

LESOTHO HIGHLANDS WATER PROJECT PHASE 2

LESOTHO HIGHLANDS WATER PROJECT PHASE 2. OVERVIEW By P D Pyke October 2012. Yield analysis - Polihali. Dam yield ( MOL 1992, FSL 2065) viewed in isolation: 14,75 m 3 /s 465mil. m 3 /a Incremental Orange River system yield 5,76m 3 /s 182 mill.m 3 /a. Phase 1 Dams Yield

ronna
Download Presentation

LESOTHO HIGHLANDS WATER PROJECT PHASE 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LESOTHO HIGHLANDS WATER PROJECT PHASE 2 OVERVIEW By P D Pyke October 2012

  2. Yield analysis - Polihali • Dam yield ( MOL 1992, FSL 2065) viewed in isolation: • 14,75 m3/s 465mil. m3/a • Incremental Orange River system yield • 5,76m3/s 182 mill.m3/a

  3. Phase 1 Dams Yield 780 106 m3/annum 24.7 m3/s Polihali Contribution to System Yield (of LHWP) 465 106 m3/annum 14.75 m3/s Total LHWP Phase1 and Phase 2 Yield 1271 106 m3/annum 40.3 m3/s - but also need yield replacement dam for Orange River Polihali Yield Analysis

  4. Main Embankment

More Related