170 likes | 255 Views
CARE And Design Studies. Susan Smith (ASTeC) . Particle Physics Accelerator R&D Activities In The European Framework 6 Programme. Content. CARE JRAs Networks ELAN Design Studies LCDS. http://esgard.lal.in2p3.fr /. CARE. JOINT RESEARCH ACTIVITIES. Infrastructures and Projects.
E N D
CARE And Design Studies Susan Smith (ASTeC) Particle Physics Accelerator R&D Activities In The European Framework 6 Programme LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
Content • CARE • JRAs • Networks • ELAN • Design Studies • LCDS LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
http://esgard.lal.in2p3.fr/ LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
CARE LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
JOINT RESEARCH ACTIVITIES LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
Infrastructures and Projects LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
NETWORKS LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
Current Status LCABD Through Manchester University 70kEuro/35kEuro Kick Off meeting Frascati 4th -6th May 13:00 LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
Plans for the Frascati Meeting: 1st day (Tuesday May 4 ) Plenary 9h-13h: Design Study for a future GLC ITRP (choice of technology for a GLC) Presentation from WP (including connections) Parallel + common WP: 5 rooms needed ? Welcome Drink 18h30 2nd day(Wednesday May 5 ) Parallel + common WP Critical discussion of our strategy (plenary afternoon) Dinner 3d day(Tuesday May 6 ) Summaries Steering Committee meeting LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
CERN DESY LOI LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
LC Design Study 1. Management Eckhard Elsen (DESY) eckhard.elsen@desy.de Gilbert Guignard (CERN) gilbert.guignard@desy.de 2. BDS Susan Smith (CCLRC) s.l.smith@dl.ac.uk 3. DR Suzanne Guiducci (INFN-LNF) susanna.guiducci@lnf.infn.it 4. Pol. e+ source Achim Stahl (DESY) achim.stahl@desy.de 5. Diagnostics Grahame Blair (RHUL) blair@pp.rhul.ac.uk 6. Lumi stab. Studies Daniel Schulte (CERN) daniel.schulte@cern.ch 7. Metrology & Stab. Yannis Karyotakis (LAPP, Fr) karyotakis@lapp.in2p3.fr 8. GAN tba LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith
University Input Phil Burrows is coordinating the technical input Manchester (Roger Barlow) is acting as the Participating Organisation. Others will be contractors or associates of Manchester * brief description of task with milestones and deliverables * contact person * integrated # person months of effort over the DS period (3 years, starting 1/1/05) * cost of the integrated person months (3) * cost of equipment (3) * cost of travel (3) * total cost of task (3) LC-UK Jan 04 EU-Framework 6 Accelerator Activities Susan Smith