1 / 15

Update on TROPOMI instrument and status

Update on TROPOMI instrument and status. Pepijn Veefkind , Diego Loyola, Andreas Richter, Ilse Aben, Michel van Roozendael, Isabelle De Smedt, Richard Siddans, Thomas Wagner and Herbert Nett. Long Term Monitoring. GOME-2C. 2015-2022 daily global coverage. 2019 - ~2030 hourly over Europe.

rupert
Download Presentation

Update on TROPOMI instrument and status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on TROPOMI instrument and status • Pepijn Veefkind, Diego Loyola, Andreas Richter, Ilse Aben, Michel van Roozendael, Isabelle De Smedt, Richard Siddans, Thomas Wagner and Herbert Nett

  2. Long Term Monitoring GOME-2C

  3. 2015-2022 daily global coverage 2019 - ~2030 hourly over Europe gems | tempo 2017 - ... hourly over SE - ASIA 2017 - ... hourly over N-America KARI | NASA

  4. 6x higher spatial resolution7x7 km2 vs. 13x24 km2 1-5x higher signal-to-noise Variable binning scheme better cloud informationfrom the oxygen A+B bands CO and CH4 observationsfrom the SWIR band Data rate ~20x OMI From OMI to TROPOMI Gloudemans et al., SCIAMACHY CO over land and oceans: 2003–2007 interannual variability, ACP, 2009

  5. OMI Zoom ~13x12 km2 Sampling 12 September 2006 OMI special zoom mode 13 x 13 km²

  6. TROPOMI Data Products The operational data products will be developed by a collaboration of European institutes.KNMI/DLR-IMF/IUP/BIRA-IASB/SRON/MPIC/RAL/FMI

  7. TROPOMIL2 PRODUCTS L2 Working Group PROTOTYPE VERIFICATION OPERATIONAL SW GOME-SCIAMACHY-OMI KNMI | DLR | IUP-Bremen | BIRA | SRON | MPIC | RAL

  8. Performance Overview

  9. SNR - CDR Status

  10. TROPOMI Status • Modules are being assembled • Start of calibration: Summer 2014 • Instrument delivery: Fall 2014 • Planned launch date: September 2015 • ESA AO for validation will be opened early 2014

  11. Mass ~200 kg • Average power ~150W • Level 1B size is approx. 20 GByte /orbit:25x data volume of OMI UV UVN-OBM SWIR-OBM Telescope UVIS Nadir Baffle Connector Bracket Telescope Support Structure Sun Baffle Folding Mirror mechanism Diffuser mechanism

More Related