10 likes | 167 Views
TDG project timeline and roadmap. Integration and interfacing of software. Single-station field tests. Dual-station field tests. Working Prototype. Design (Florida). Demo BZE. Demo DR. BZE. DR. Integration (Pittsburgh). Transnational tests. 2004. 2005. 2006.
E N D
TDG project timeline and roadmap Integration and interfacing of software Single-station field tests Dual-station field tests Working Prototype Design (Florida) Demo BZE Demo DR BZE DR Integration (Pittsburgh) Transnational tests 2004 2005 2006 First bare-bones working system need networks, transnational practices overall design and its components extend capabilities, DR/Belize field work (focus groups, feedback)