New Wednesday meeting cycle • 9.11 AD&I biweekly • 16.11 SCRF ML meeting monthly • 23.11 AD&I biweekly • 30.11 (Free slot) monthly • 7.12 AD&I • 14.12 … • Two meetings per month for AD&I team. • TDR related work: • design (& cost) work • documentation (EDMS) • TDR writing (coming soon!)
Today • Review DESY BTR meeting summary • Sent to AD&I mailing list 01.11.11 • Action item list (for today) • status • Agenda for next meeting (23.11)
Baseline Decisions • Retain a two-stage bunch compressor • Reduced field Flux Concentrator for e+ source • 500 MV s-band linac for auxiliary positron source • Include e+/e- production overhead (margin) in specification for RF • HLRF system for 5 GeV Boosters RDR/DRFS • Adjustment of the damping ring transfer lines (Central Region) • Physics related instrumentation accepted as proposed. • BDS/FFS length fixed at current length
Other issues discussed • Global timing • Finalisation of path length for TDR • Understand construction tolerance (survey) • Location (and design) of adjustment chicane • Final path lengths not known until after KEK BTR (Jan 2012). • Operations and commissioning • Understand strategy and use of beam dumps • desired rating etc. • Understand scope of use of aux. positron source
Action Items (4.11.11) • Prepare detailed design change document for PLTR, PRTL, ELTR, PRTL • Palmer, Paterson • Friday 4.11 • Prepare central region cartoon indicating updated beamline and dump locations • Walker, List, Palmer • Friday 4.11 Draft document complete (Report from Palmer/List)
Action Items (for today) #1 • Update top-level parameters • Make Dp/p consistent with two-stage compressor and FC undulator parameters • Walker, List, Gai -> try for end of next week! • Include shifted waist enhancement in luminosities • Walker [Meeting tomorrow with T. Hartin → next week].
Action Items (for today) #2 • Update machine parameters • Consolidate/update compressor parameters for two-stage system • Solyak • Consolidate positron source parameters for 3.2 T Flux Concentrator • Gai • Update/confirm Damping Ring acceptance parameters • Guiducci, Palmer, Gai -> Review Wanming’s design parameters • Review and update source RF parameters (gradient etc.) • Walker, Gai, Sheppard -> send proposal tomorrow
Action Items (for today) #3 • Lattice design work • Propose remaining treaty points: • e- ML to e+ source – End of MPS collimator section • e+ ML to e+ BDS – End of MPS collimator section • Walker, List • Conceptual layout of Aux. source (CFS requirements) • Gai, Kuriki • CFS: Detector hall layout – finalise numbers of shafts and overall layout, support tunnel • mid December for CERN/FNAL like sites. • Include installation in commissioning group? • Meeting to discuss service tunnel layout (soon)
Next ADI meetings (tentative) • 23.11.11 • Review action item status • Review progress on lattice design work • note: freeze due 30.11 • TDR writing assignments and schedule • 7.12.11 • Review action item status • CFS update to central region drawings, service tunnel etc. • TeV upgrade status (parameters)