An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Wednesday meeting cycle • 9.11 AD&I biweekly • 16.11 SCRF ML meeting monthly • 23.11 AD&I biweekly • 30.11 (Free slot) monthly • 7.12 AD&I • 14.12 … • Two meetings per month for AD&I team. • TDR related work: • design (& cost) work • documentation (EDMS) • TDR writing (coming soon!)

  2. Today • Review DESY BTR meeting summary • Sent to AD&I mailing list 01.11.11 • Action item list (for today) • status • Agenda for next meeting (23.11)

  3. Baseline Decisions • Retain a two-stage bunch compressor • Reduced field Flux Concentrator for e+ source • 500 MV s-band linac for auxiliary positron source • Include e+/e- production overhead (margin) in specification for RF • HLRF system for 5 GeV Boosters RDR/DRFS • Adjustment of the damping ring transfer lines (Central Region) • Physics related instrumentation accepted as proposed. • BDS/FFS length fixed at current length

  4. Other issues discussed • Global timing • Finalisation of path length for TDR • Understand construction tolerance (survey) • Location (and design) of adjustment chicane • Final path lengths not known until after KEK BTR (Jan 2012). • Operations and commissioning • Understand strategy and use of beam dumps • desired rating etc. • Understand scope of use of aux. positron source

  5. Action Items (4.11.11) • Prepare detailed design change document for PLTR, PRTL, ELTR, PRTL • Palmer, Paterson • Friday 4.11 • Prepare central region cartoon indicating updated beamline and dump locations • Walker, List, Palmer • Friday 4.11 Draft document complete  (Report from Palmer/List)

  6. Action Items (for today) #1 • Update top-level parameters • Make Dp/p consistent with two-stage compressor and FC undulator parameters • Walker, List, Gai -> try for end of next week! • Include shifted waist enhancement in luminosities • Walker [Meeting tomorrow with T. Hartin → next week].

  7. Action Items (for today) #2 • Update machine parameters • Consolidate/update compressor parameters for two-stage system • Solyak • Consolidate positron source parameters for 3.2 T Flux Concentrator • Gai • Update/confirm Damping Ring acceptance parameters • Guiducci, Palmer, Gai -> Review Wanming’s design parameters • Review and update source RF parameters (gradient etc.) • Walker, Gai, Sheppard -> send proposal tomorrow

  8. Action Items (for today) #3 • Lattice design work • Propose remaining treaty points: • e- ML to e+ source – End of MPS collimator section • e+ ML to e+ BDS – End of MPS collimator section • Walker, List • Conceptual layout of Aux. source (CFS requirements) • Gai, Kuriki • CFS: Detector hall layout – finalise numbers of shafts and overall layout, support tunnel • mid December for CERN/FNAL like sites. • Include installation in commissioning group? • Meeting to discuss service tunnel layout (soon)

  9. Next ADI meetings (tentative) • 23.11.11 • Review action item status • Review progress on lattice design work • note: freeze due 30.11 • TDR writing assignments and schedule • 7.12.11 • Review action item status • CFS update to central region drawings, service tunnel etc. • TeV upgrade status (parameters)